论文部分内容阅读
文章通过采取新建进水涵管和排水泵站、修建栈桥等工程措施,使青年湖的水质得到改善,实现了“浊水排出,清水汇入”的目标。
Through adopting measures such as newly built water culvert and drainage pumping stations and construction of trestle bridge, the article improves the water quality of Youth Lake and realizes the goal of “discharging turbid water and importing clean water”.