Discussion on Construction Problems and Construction Management
SHI Zhibin
(Ningxia No.5 Construction Co., Ltd., Yinchuan, Ningxia Hui Autonomous Region, 750021 China)
Abstract: The performance and service life of construction engineering directly depends on the construction quality and construction technology management level. If the construction unit can not guarantee the construction quality, it is bound to waste more human, material and financial resources, and the market competition will always be in a passive position. If the construction quality fails to meet the requirements, the service life of the building will be shortened, the progress of the construction project will be slowed down, and the dominant and hidden diseases of the construction project will prevail. This paper analyzes the common construction quality problems and related management problems in the construction process, and puts forward some practical improvement measures.
Key Words: Construction; Quality; Management; Construction technology
随着我国建筑业的发展,建筑质量控制和质量管理工作越来越受到社会的广泛关注[1]。总的来说,建筑工程的整体质量需要从质量控制和技术监督两个方面来把握。本文详细分析了我国建筑工程施工过程中存在的施工质量问题及技术管理问题,并根据分析结果提出了切实可行的解决方案,采取一定的措施确保我国建筑施工质量的全面提高。
1 建筑施工质量问题及对策
1.1 斜屋面混凝土施工中存在的问题与解决措施
随着建筑施工技术的发展和建筑工程设计标准的提高,斜屋顶已成为现代建筑的一种新形式[2]。其坡度设置为40°~60°。对于斜屋顶侧模,由于斜屋顶板平均厚度≤120mm,钢筋布置间距较小(过密集),斜屋面施工往往面临振捣器难以插入的问题。另外,倾斜顶板坡度过大(大于40°~60°)时,在振捣混凝土过程中容易出现混凝土脱落现象,从而造成混凝土表面不平整,最终导致混凝土表面蜂窝孔洞状态。因此,斜屋面混凝土施工质量难以满足工程设计要求,施工质量合格率很低[3]。
改变传统的单面模板施工方法是解决这一问题的有效途径。本文提出工艺流程为立钢管放支撑→底模施工→梁板钢筋绑扎→隐蔽验收→定位并放面模→预留浇筑槽→按预留槽从下至上分段浇筑( 逐层浇筑、逐层封闭) →养护与拆模→成品保护。使用双面模板(其中面模安装与固定剖面图如图1所示),并在梁板钢筋绑扎中,采用双层双向配筋[4]。
对于混凝土浇筑问题,采用预留浇筑槽和分层对称浇筑混凝土的方式,浇筑槽的位置按照混凝土浇筑的分层厚度确定,分层厚度包括已封模板的宽度与预留槽宽度之和。按照传统施工经验,分层厚度宜控制在1800mm左右(包括1200mm宽下段封模部位及600mm宽上段预留浇筑槽部位),在实际工程中可适当进行调整,分层厚度界线点最好能控制在板跨的1/3处[5]。
斜屋面由于坡度较大,浇筑时若采用泵送混凝土浇筑,速度难以控制,易产生离析,故采用塔式起重机配合施工。为加快混凝土浇筑速度,准备 2 只料斗轮流装料吊运。在檐口搭设宽 900mm 操作架,同时作为安全防护架。沿坡屋面每条坡脊线径向逐条设置 600mm宽斜道,上钉防滑条,按施工操作进程随时移动。浇筑混凝土时,以屋檐为起点,各坡面对称循环浇筑,浇筑完一层后即可封闭本层的面层盖板,然后再浇筑上一层混凝土,分层处浇筑间隙不得超过混凝土的初凝时间,相互依次循环进行,直至浇筑结束[6]。 1.2 变形施工问题与解决方案
在建筑施工中,变形缝的存在相当普遍,变形缝的处理难度很大。多为现代和当代建筑工程,建筑空间的形态和建筑立面形式的多样性和多元化,这种施工路线对应着变形缝向复杂方向发展。如果建筑施工过程中未对变形缝进行全面有效的预防或处理,势必会导致施工作业后期或使用阶段出现渗漏问题,从而导致建筑整体视觉效果降低,建筑的施工性能和使用寿命缩短。另外,变形缝的各种形式和加工方法也不尽相同。本文将讨论几种典型的变形缝方法。
针对传统变形缝施工工艺的目的,其主要伸缩缝采用铝合金做防水抗弯工艺。多年来的实践证明,传统的变形缝施工工艺无法对复杂程度较高的结构表面进行弯曲,其施工效果无法满足变形缝施工标准的相关要求。
建筑外墙大量的嵌条以复杂变形的形式装订而成,施工方案如图1所示。
图2为施工工程的变形缝施工图,①、②为铝材变形缝翼板,右图①用于挡土墙,并可连接到垂直墙面上;②用于装饰建筑外部形象的塑造。变形缝挡土墙,在混凝土浇筑前,应嵌入建筑结构内,并伸入混凝土宽度≥85mm,混凝土上下两端应延伸约±100mm。设置为固定变形缝瓣,应根据变形缝的具体情况进行调整。在模板两侧接缝安装过程中,应保证模板与铝型材断开位置的一致性,并保证用楔子将钢片插入挤压牢固。用于装饰的变形缝翼板,墙面装饰层的安装位置,其搭接长度和对接长度应等于变形缝宽度的1/2。
1.3 门窗粉刷施工中的问题与解决措施
传统的门窗安装施工往往安排在墙面油漆作业前,实践证明,这种施工方法耐水性差,窗扇易损坏,施工周期长等缺点。
针对门窗部件的渗漏问题,本文提出实现窗后安装的方法,即在门窗刷完漆后再安装这些部件。施工工艺操作流程:内外墙刷漆→测水平→门窗框刷漆(应保证门窗框标高、尺寸控制在规范范围内)→中线钻孔,并设置伸缩管→安装门窗框,同步完成发泡剂填充→密封处理→安装窗扇及玻璃门窗框。
为加强对门窗施工质量的控制,施工现场必须从以下几个方面抓好:对窗框进行油漆,应严格控制窗顶和窗台标高,一般情况下,窗顶和窗台标高误差不应超过5mm,同一门窗洞口标高误差不得超过10mm,对角线误差不得超过10mm。粉刷墙面时,一定要严格按照工程设计要求设置窗顶和窗台的坡向和坡度,防止出现“倒”现象。填充发泡剂时,应使用铝合金边框(可伸缩)侧边的密封盒,以摆脱框架至溢出边缘的发泡剂在发泡剂填充完成24h后,应将其切割,并涂上相应的硅酮胶。框架与窗扇的固定是用自攻螺钉拧入膨胀管内,正常情况下,膨胀管长度不应超过50mm,且材料应为膨胀聚丙烯塑料管,膨胀管之间的间距等于固定点之间的间距。
2 建筑工程技术管理存在的问题及对策
随着我国市场经济的发展,建设单位工程分包现象日益普遍。这种方式存在的问题包括:施工单位之间的工程分包责任不明确;施工过程安排不严密或漏分现象较多。同时,建筑工程分包在建筑工程设计、施工技术管理、施工安全管理、施工阶段监理制度管理等方面存在问题,这些问题严重影响了建筑工程施工进度,工程质量、工程造价和工程效益。建筑施工技术管理问题直接影响到施工质量、施工安全和施工效果,加强建筑施工技术管理具有重要意义。
2.1 施工准备阶段
作为建筑施工单位,必须在项目开工前建立和完善相关的建筑施工技术管理制度,并应确保相关技术规范和标准的一致性和彻底性。此外,施工单位应针对不同类型、不同人群进行必要的安全知识、教育和专业技能培训。同时,施工单位的施工作业要组织专业技术人员认真分流施工图纸,并应严格按照施工项目的具体情况进行施工,对施工图进行优化,消除施工图中的一些显性问题和隐藏问题。
建筑施工单位必须明确施工阶段的准确性和各部门负责人的职责,并应合理配置资金和机械设备等资源,确保整个施工过程有明确的分工,并对个人负责,最终保证建设工程的顺利开展。
2.2 建筑施工阶段
它对建筑施工阶段的施工质量、施工进度和施工安全的技术管理起着直接和决定性的作用。此外,由于建筑工程具有长期性、复杂性、技术性等特点,建筑施工阶段的技术管理应涵盖以下几个方面:加强施工质量管理,对施工过程中的施工作业及时进行技术检测;严格控制施工进度和造价。
建筑施工技术管理是组织工程现场施工人员做好施工技术试验的重要保证,有针对性和高质量施工。在施工现场的施工阶段,技术管理人员必须严格按照事先的技术检测随时巡查,并检查项目现场施工是否有其施工质量标准,立即责令停止施工或重新施工等为保证施工质量,现场施工实现质的提高。同时,施工现场施工监理人员也应积极践行监理对施工人员施工成本尽可能的控制措施。
2.3 施工工程验收阶段
建设工程竣工验收阶段的技术管理对建设工程质量和施工单位的质量以及经济效益和社会效益有着重要的影响。因此,工程技术管理要严格。认真核对施工资料,并应严格按照有关技术要求,执行相应的质量验收标准,确保施工工程质量。另外,工程技术管理要严格执行有关技术规范,对工程质量问题,及时提出意见,以免因工程质量风险而引起不必要的经济纠纷。
3 结语
综上所述,现代建筑施工单位对改进和完善施工质量控制措施和施工管理工作具有重要意义。以提高工程建设整体质量为基础,建立健全科学、全面、有效的项目管理规划、工程建设管理和施工监理制度,确保建筑工程质量,施工安全和施工進度满足既定要求,最终实现施工作业利润最大化。
参考文献
[1] 倪文龙.大坡度钢筋混凝土斜屋面施工技术与质量控制[J].城市建筑,2019,16(24):120-121.
[2] 袁广.盾构垂直下穿施工对地下综合管廊变形规律影响探究[D].北京:中国地质大学(北京),2020.
[3] 梁正彪. 住宅工程质量通病控制研究[D].苏州:苏州科技大学,2018.
[4] 李锐.房屋建筑工程施工质量管理的研究[D].成都:西南交通大学,2019.
[5] 赵丽军.房屋建筑工程施工安全模块化管理研究[D].杭州:浙江大学,2018.
[6] 曾晨晖.探析房建工程管理与施工技术[J].中国住宅设施,2020(10):107-108.
关键词:建筑施工 质量问题 管理问题 施工技术问题
中图分类号:TU712 文献标识码:A 文章编号:1674-098X(2021)03(a)-0030-03
Discussion on Construction Problems and Construction Management
SHI Zhibin
(Ningxia No.5 Construction Co., Ltd., Yinchuan, Ningxia Hui Autonomous Region, 750021 China)
Abstract: The performance and service life of construction engineering directly depends on the construction quality and construction technology management level. If the construction unit can not guarantee the construction quality, it is bound to waste more human, material and financial resources, and the market competition will always be in a passive position. If the construction quality fails to meet the requirements, the service life of the building will be shortened, the progress of the construction project will be slowed down, and the dominant and hidden diseases of the construction project will prevail. This paper analyzes the common construction quality problems and related management problems in the construction process, and puts forward some practical improvement measures.
Key Words: Construction; Quality; Management; Construction technology
随着我国建筑业的发展,建筑质量控制和质量管理工作越来越受到社会的广泛关注[1]。总的来说,建筑工程的整体质量需要从质量控制和技术监督两个方面来把握。本文详细分析了我国建筑工程施工过程中存在的施工质量问题及技术管理问题,并根据分析结果提出了切实可行的解决方案,采取一定的措施确保我国建筑施工质量的全面提高。
1 建筑施工质量问题及对策
1.1 斜屋面混凝土施工中存在的问题与解决措施
随着建筑施工技术的发展和建筑工程设计标准的提高,斜屋顶已成为现代建筑的一种新形式[2]。其坡度设置为40°~60°。对于斜屋顶侧模,由于斜屋顶板平均厚度≤120mm,钢筋布置间距较小(过密集),斜屋面施工往往面临振捣器难以插入的问题。另外,倾斜顶板坡度过大(大于40°~60°)时,在振捣混凝土过程中容易出现混凝土脱落现象,从而造成混凝土表面不平整,最终导致混凝土表面蜂窝孔洞状态。因此,斜屋面混凝土施工质量难以满足工程设计要求,施工质量合格率很低[3]。
改变传统的单面模板施工方法是解决这一问题的有效途径。本文提出工艺流程为立钢管放支撑→底模施工→梁板钢筋绑扎→隐蔽验收→定位并放面模→预留浇筑槽→按预留槽从下至上分段浇筑( 逐层浇筑、逐层封闭) →养护与拆模→成品保护。使用双面模板(其中面模安装与固定剖面图如图1所示),并在梁板钢筋绑扎中,采用双层双向配筋[4]。
对于混凝土浇筑问题,采用预留浇筑槽和分层对称浇筑混凝土的方式,浇筑槽的位置按照混凝土浇筑的分层厚度确定,分层厚度包括已封模板的宽度与预留槽宽度之和。按照传统施工经验,分层厚度宜控制在1800mm左右(包括1200mm宽下段封模部位及600mm宽上段预留浇筑槽部位),在实际工程中可适当进行调整,分层厚度界线点最好能控制在板跨的1/3处[5]。
斜屋面由于坡度较大,浇筑时若采用泵送混凝土浇筑,速度难以控制,易产生离析,故采用塔式起重机配合施工。为加快混凝土浇筑速度,准备 2 只料斗轮流装料吊运。在檐口搭设宽 900mm 操作架,同时作为安全防护架。沿坡屋面每条坡脊线径向逐条设置 600mm宽斜道,上钉防滑条,按施工操作进程随时移动。浇筑混凝土时,以屋檐为起点,各坡面对称循环浇筑,浇筑完一层后即可封闭本层的面层盖板,然后再浇筑上一层混凝土,分层处浇筑间隙不得超过混凝土的初凝时间,相互依次循环进行,直至浇筑结束[6]。 1.2 变形施工问题与解决方案
在建筑施工中,变形缝的存在相当普遍,变形缝的处理难度很大。多为现代和当代建筑工程,建筑空间的形态和建筑立面形式的多样性和多元化,这种施工路线对应着变形缝向复杂方向发展。如果建筑施工过程中未对变形缝进行全面有效的预防或处理,势必会导致施工作业后期或使用阶段出现渗漏问题,从而导致建筑整体视觉效果降低,建筑的施工性能和使用寿命缩短。另外,变形缝的各种形式和加工方法也不尽相同。本文将讨论几种典型的变形缝方法。
针对传统变形缝施工工艺的目的,其主要伸缩缝采用铝合金做防水抗弯工艺。多年来的实践证明,传统的变形缝施工工艺无法对复杂程度较高的结构表面进行弯曲,其施工效果无法满足变形缝施工标准的相关要求。
建筑外墙大量的嵌条以复杂变形的形式装订而成,施工方案如图1所示。
图2为施工工程的变形缝施工图,①、②为铝材变形缝翼板,右图①用于挡土墙,并可连接到垂直墙面上;②用于装饰建筑外部形象的塑造。变形缝挡土墙,在混凝土浇筑前,应嵌入建筑结构内,并伸入混凝土宽度≥85mm,混凝土上下两端应延伸约±100mm。设置为固定变形缝瓣,应根据变形缝的具体情况进行调整。在模板两侧接缝安装过程中,应保证模板与铝型材断开位置的一致性,并保证用楔子将钢片插入挤压牢固。用于装饰的变形缝翼板,墙面装饰层的安装位置,其搭接长度和对接长度应等于变形缝宽度的1/2。
1.3 门窗粉刷施工中的问题与解决措施
传统的门窗安装施工往往安排在墙面油漆作业前,实践证明,这种施工方法耐水性差,窗扇易损坏,施工周期长等缺点。
针对门窗部件的渗漏问题,本文提出实现窗后安装的方法,即在门窗刷完漆后再安装这些部件。施工工艺操作流程:内外墙刷漆→测水平→门窗框刷漆(应保证门窗框标高、尺寸控制在规范范围内)→中线钻孔,并设置伸缩管→安装门窗框,同步完成发泡剂填充→密封处理→安装窗扇及玻璃门窗框。
为加强对门窗施工质量的控制,施工现场必须从以下几个方面抓好:对窗框进行油漆,应严格控制窗顶和窗台标高,一般情况下,窗顶和窗台标高误差不应超过5mm,同一门窗洞口标高误差不得超过10mm,对角线误差不得超过10mm。粉刷墙面时,一定要严格按照工程设计要求设置窗顶和窗台的坡向和坡度,防止出现“倒”现象。填充发泡剂时,应使用铝合金边框(可伸缩)侧边的密封盒,以摆脱框架至溢出边缘的发泡剂在发泡剂填充完成24h后,应将其切割,并涂上相应的硅酮胶。框架与窗扇的固定是用自攻螺钉拧入膨胀管内,正常情况下,膨胀管长度不应超过50mm,且材料应为膨胀聚丙烯塑料管,膨胀管之间的间距等于固定点之间的间距。
2 建筑工程技术管理存在的问题及对策
随着我国市场经济的发展,建设单位工程分包现象日益普遍。这种方式存在的问题包括:施工单位之间的工程分包责任不明确;施工过程安排不严密或漏分现象较多。同时,建筑工程分包在建筑工程设计、施工技术管理、施工安全管理、施工阶段监理制度管理等方面存在问题,这些问题严重影响了建筑工程施工进度,工程质量、工程造价和工程效益。建筑施工技术管理问题直接影响到施工质量、施工安全和施工效果,加强建筑施工技术管理具有重要意义。
2.1 施工准备阶段
作为建筑施工单位,必须在项目开工前建立和完善相关的建筑施工技术管理制度,并应确保相关技术规范和标准的一致性和彻底性。此外,施工单位应针对不同类型、不同人群进行必要的安全知识、教育和专业技能培训。同时,施工单位的施工作业要组织专业技术人员认真分流施工图纸,并应严格按照施工项目的具体情况进行施工,对施工图进行优化,消除施工图中的一些显性问题和隐藏问题。
建筑施工单位必须明确施工阶段的准确性和各部门负责人的职责,并应合理配置资金和机械设备等资源,确保整个施工过程有明确的分工,并对个人负责,最终保证建设工程的顺利开展。
2.2 建筑施工阶段
它对建筑施工阶段的施工质量、施工进度和施工安全的技术管理起着直接和决定性的作用。此外,由于建筑工程具有长期性、复杂性、技术性等特点,建筑施工阶段的技术管理应涵盖以下几个方面:加强施工质量管理,对施工过程中的施工作业及时进行技术检测;严格控制施工进度和造价。
建筑施工技术管理是组织工程现场施工人员做好施工技术试验的重要保证,有针对性和高质量施工。在施工现场的施工阶段,技术管理人员必须严格按照事先的技术检测随时巡查,并检查项目现场施工是否有其施工质量标准,立即责令停止施工或重新施工等为保证施工质量,现场施工实现质的提高。同时,施工现场施工监理人员也应积极践行监理对施工人员施工成本尽可能的控制措施。
2.3 施工工程验收阶段
建设工程竣工验收阶段的技术管理对建设工程质量和施工单位的质量以及经济效益和社会效益有着重要的影响。因此,工程技术管理要严格。认真核对施工资料,并应严格按照有关技术要求,执行相应的质量验收标准,确保施工工程质量。另外,工程技术管理要严格执行有关技术规范,对工程质量问题,及时提出意见,以免因工程质量风险而引起不必要的经济纠纷。
3 结语
综上所述,现代建筑施工单位对改进和完善施工质量控制措施和施工管理工作具有重要意义。以提高工程建设整体质量为基础,建立健全科学、全面、有效的项目管理规划、工程建设管理和施工监理制度,确保建筑工程质量,施工安全和施工進度满足既定要求,最终实现施工作业利润最大化。
参考文献
[1] 倪文龙.大坡度钢筋混凝土斜屋面施工技术与质量控制[J].城市建筑,2019,16(24):120-121.
[2] 袁广.盾构垂直下穿施工对地下综合管廊变形规律影响探究[D].北京:中国地质大学(北京),2020.
[3] 梁正彪. 住宅工程质量通病控制研究[D].苏州:苏州科技大学,2018.
[4] 李锐.房屋建筑工程施工质量管理的研究[D].成都:西南交通大学,2019.
[5] 赵丽军.房屋建筑工程施工安全模块化管理研究[D].杭州:浙江大学,2018.
[6] 曾晨晖.探析房建工程管理与施工技术[J].中国住宅设施,2020(10):107-108.