马回电站1号机曾发生受油器浮动瓦烧损事故,因引进国外机组,故被迫长时间停机,后在东方电机厂帮助下,在消化吸收国外技术基础上,结合我国实际情况,予以改进,使问题得到圆满解决。
Ma Hui Power Station Unit 1 occurred in the burning of floating oil tile friction accident, due to the introduction of foreign units, it was forced to stop for a long time, with the help of the Dongfang Electrical Machinery Factory, based on digestion and absorption of foreign technology, combined with the actual situation in our country, Be improved so that the problem can be satisfactorily resolved.