论文部分内容阅读
洛湛铁路益娄段DK88+550段左侧堑坡高达30m以上,为了减少刷方和保证边坡稳定,设置预应力拉杆锚固桩板墙支护措施,取得良好的效果。结合工程实例,简要介绍预应力拉杆锚固桩板墙施工技术。
In order to reduce the brush side and ensure the stability of the slope, the left-hand cutting slope of the section DK88 + 550 of the section of Yi-Lou section of Luoyang-Zhanjiang Railway should be set up with the support measures of prestressed tie rod anchored pile wall and achieved good results. Combined with engineering examples, a brief introduction of prestressed tie rod anchorage pile wall construction technology.