【摘 要】
:
欣古(Xingo)水电站位于巴西圣弗朗西斯科河上的阿拉戈斯州和塞尔日培州交界处,总装机容量为5000MW,是巴西的第二大水电站。该电站有以下突出特点:(1)工程难度小。由于大坝(
论文部分内容阅读
欣古(Xingo)水电站位于巴西圣弗朗西斯科河上的阿拉戈斯州和塞尔日培州交界处,总装机容量为5000MW,是巴西的第二大水电站。该电站有以下突出特点:(1)工程难度小。由于大坝(长为850m,高为140m 的面板堆石坝)是建在一个由圣弗朗西斯科河冲蚀成的干枯的峡谷里,因而在这修建水库相当容易。(2)能够保持生态平衡。由于不淹没良田和森林,所以对周围的植物和动物几乎不造成
The Xingo hydroelectric power station is located at the junction of Alagoas and Seljampysca on the São Francisco River in Brazil with a total installed capacity of 5,000MW, making it Brazil’s second largest hydropower station. The power station has the following salient features: (1) project difficulty is small. Due to the dam (850m long, 140m high CFRD) built in a dry canyon eroded by the San Francisco River, it is fairly easy to build a reservoir here. (2) to maintain ecological balance. Since there is no flooding of fertile fields and forests, there is almost no damage to surrounding plants and animals
其他文献
日前合肥锻压机床股份有限公司为杭州一家用户生产了两台套专用于生产汽车、列车摩擦材料的液压机 :YH5 4— 2 5 0型和 2 5 0 0kN平板 6层热压液压机 ,最近通过用户现场验收。这
第七届全国水利水电工程青年学术研讨会于1998年3月25~27日在武汉水利电力大学(宜昌)召开。此次会议由中国水利学会青年科技工作委员会、中国水力发电学会青年科技工作委员会
今年汛期吉林省中西部洪涝灾害严重。据现场调查分析.灾情主要发生在堤防和水库塘坝工程上、堤坝漏水、断面单薄、宽度不够、标准不高是造成工程破坏的根源。为此,应抓住秋后有
目的 :探讨 p5 3、c- m yc、PCNA在大肠癌组织中的过度表达及临床意义。方法 :采用免疫组化技术检测 PCNA、c- myc、p5 3在大肠癌、癌旁组织、正常大肠黏膜及大肠腺瘤性息肉
随着对职业教育“就业为导向,服务为宗旨”“以学者为中心”等新理念的深入理解,市场对人才多元化,高技能型人才的需求和培养模式的探讨,课程改革和新课程体系的构建,与之相
【正】 ’98长江抗洪斗争取得了伟大胜利,江苏防讯抗洪的战绩引人瞩目,实现了有险无灾,有洪无涝。其主要经验是:1、万众一心,协力抗洪。省委、省政府坚决贯彻党中央、国务院
作为国家建设工程的重要组成部分,基建工程关系到国家的各个组成部分,发挥着不可替代的作用。基建工程不仅对国民经济的发展起着不可替代的作用,同时关系着社会主义现代化建
加速推进科技成果的转移及转化进程,已成为跨世纪世界经济变动的一个重要趋势。各国政府特别是发达国家政府都已认识到,技术转移不仅对于产业结构升级、经济发展至关重要,而
20 0 2年 1 0月 1 8日 ,南非国际问题研究所董事会副主席、南非现任总统塔博·姆贝基的胞弟莫莱齐·姆贝基 (MoeletsiMbeki)先生在中国社会科学院西亚非洲研究所发表了题为“
This paper describes an S-band wideband high efficiency power amplifier based on the Nanjing Electron Device Institute’s Ga As p HEMT monolithic microwave inte