论文部分内容阅读
为解决水上飞机漏水问题,船底部分有四块大板件(板件为双曲面),其连接方法由铆接改为全胶接。工厂与有关单位一起从一九七九年开始做了大量的工艺探索,根据产品特点,确定对 SH5-0513-00全尺寸模拟试件的加
In order to solve the problem of waterplane leaking, there are four large plates (the plate is hyperboloid) in the bottom of the ship. The connection method is changed from riveting to full gluing. The factory together with the relevant units have done a great deal of technological exploration since 1979. According to the characteristics of the products, it has determined that the SH5-0513-00 full-scale simulation test piece