论文部分内容阅读
<正>Conditions of Contract for Construction, FIDIC, 1999现场进入权条款(2.1 Right of Access to the Site)对FIDIC权利义务的表达如下。2.1 Right of Access to the Site The Employer 1 shall give the Contractor right of access to, and possession of, all parts of the Site within the time (or times) stated in the Appendix to Tender. The right and possession may not be exclusive to the