广东省潮州市凤凰水电厂二级电站B站两台机组投产于2004年10月,其下导轴承温度计引出线原设计采用在轴承盖上用锡焊连接,存在拆除时需全部焊除各条接线,由于温度计引出线众多,而下导轴承处空间非常狭小,不可能多人同时进行工作,造成工作非常不便,也影响工作进度。为我厂的安全生产着想,我们经过多方查找资料、查阅图纸、实际考察和运行实践,找到了解决办法,并进行了改造,取得了良好的效果。
Fenghuang Power Plant in Chaozhou City, Guangdong Province, two of the station B station two power station put into operation in October 2004, the lower guide bearing thermometer leads the original design used in the bearing cover with soldering connection, there is the need to remove all the welding Wiring, due to many thermometer leads, and the lower guide bearing space is very small, not many people work at the same time, resulting in very inconvenient work, but also affect the progress of work. For the sake of our plant’s production safety, after many parties searched for information, reviewed the drawings, investigated and carried out the actual operation, we found the solution and carried out the transformation with good results.