论文部分内容阅读
福建水利水电勘测设计研究院历年完成的水电工程及前期计划项目说明:1.1958—1993年统计数均指已建成投产的工程项目.2·1994年在建工程,包括已开工或已批准立项,正在进行招投标的工程。福建水利水电勘测设计研究院历年完成的水电工程及前期计划项目...
The water conservancy and hydropower engineering survey and design institute completed over the years completed the hydropower project and pre-planned project description: The statistics from 1.1958 to 1993 refer to the completed and commissioned projects. 2. Projects under construction in 1994, including works that have been started or have been approved for establishment, and projects that are currently bidding. Fujian Water Conservancy and Hydropower Survey and Design Institute completed over the years the hydropower project and pre-planned projects...