在英明领袖华主席提出的“抓纲治国”和“实现四个现代化”的战略决策指引下,为实现桥梁施工机械化、现代化,我们在702大桥南岸引桥施工中设计建造了一座自动化中心混凝土工厂。这座混凝土工厂共分五个部分。将混凝土工厂场地平面布置情况示于图1。
Under the guidance of Chairman Hua, who is the wise leader, proposed under the strategic policy of “Grabing Gang with Country” and “Realizing Four Modernizations”, in order to mechanize and modernize bridge construction, we designed and built an automation center concrete factory in the approach bridge construction on the south bank of the 702 Bridge. The concrete factory is divided into five parts. The layout of concrete factory site layout is shown in Figure 1.