葡萄牙阿尔克瓦(Alqueva)Ⅱ期电站是现有阿尔克瓦I期工程(装机260 MW)的扩建工程。该项目于2013年初由葡萄牙环境、农业海洋部启动,由葡萄牙能源局(EDP)运营。电站装机可达520MW,为葡萄牙总水电装机的4%。埃尔克瓦拱坝从瓜迪亚纳河引水,并形成了一大型水库,其年际调节库容可为整个地区供水。大
The Alqueva II power station in Portugal is an extension of the existing Alkwa Phase I project (260 MW installed). Launched in early 2013 by the Ministry of Environment, Agriculture, and Oceania of Portugal, the project is operated by the Portuguese Energy Agency (EDP). Power station installed capacity of up to 520MW, 4% of total hydropower installed capacity in Portugal. The Elkha arch dam drew water from the Guadiana River and formed a large reservoir with an interannual volume adjustment to supply water throughout the area. Big