论文部分内容阅读
三峡工程左岸98.7m混凝土拌和系统工程,预冷混凝土设计采用的工艺流程目前在国际上也是先进的,本文综合的介绍了设计参数、工艺流程、主要技术经济指标,供同行在进行设计和施工中参考。
The project of 98.7m concrete mixing system on the left bank of the Three Gorges Project and the process design of pre-cooling concrete are also advanced in the world at present. This paper introduces the design parameters, process flow and main technical and economic indexes synthetically for the design and construction In the reference.