目前电动升模施工工艺已广泛应用于混凝土烟囱的施工。该工艺装置由6部分组成:(1)内外操作架和提升架 ;(2)摆线针轮减速机和工具式锚固件 ;(3)内外模板组体 ;(4)随升井架和操作平台系统(包括砌筑吊平台) ;(5)垂直运输系统 ;(6)电气控制系统。其工作原理
At present, electric lifting mold construction technology has been widely used in concrete chimney construction. The process device consists of 6 parts: (1) inside and outside operation frame and lifting frame; (2) cycloid reducer and tool anchor; (3) inner and outer formwork set; (4) System (including masonry crane platform); (5) vertical transport system; (6) electrical control system. Its working principle