论文部分内容阅读
四港联动大道南延与省道102互通式立交暨京港澳高速薛店互通改建工程根据其特点和规模,结合施工地点的地质水文条件、气候条件、机械设备和材料供应等客观条件,运用先进技术,对主要工种施工的施工工艺原理和施工方法进行研究,保证了工程质量和施工安全。工程选择经济、合理的施工方案,并根据工程质量验收标准进行检查,做到了技术和经济的统一,为四港联动大道南延与省道102互通式立交暨京港澳高速薛店互通立交提供更为便捷快速的交通通道。
According to its characteristics and scale, combined with the objective conditions of the geologic and hydrological conditions, climatic conditions, mechanical equipment and material supply at the construction site, the four-port linkage road south extension and provincial highway 102 interchange and the interchange of Beijing-Hong Kong- Technology, the construction of the main types of construction technology principles and methods of construction to ensure the project quality and construction safety. The project chooses an economical and reasonable construction scheme and carries out inspection according to the acceptance standards of engineering quality so as to achieve the unification of technology and economy and provide more facilities for the extension of the four-port linkage road and the provincial highway 102 interchange and the cross-over interchange of Beijing-Hong Kong-Macau high-speed Xuedian interchange For quick and easy traffic access.