【摘 要】
:
在盾构施工中,每台盾构都有其特定的适应范围。在绝大多数情况下,是在特定适应范围的基础上通过对现有盾构进行或维修改造或升级扩容以求达到对工程实际情况的全面适应性。本
论文部分内容阅读
在盾构施工中,每台盾构都有其特定的适应范围。在绝大多数情况下,是在特定适应范围的基础上通过对现有盾构进行或维修改造或升级扩容以求达到对工程实际情况的全面适应性。本文针对盾构环流系统能力不足的情况,在现有设备的基础上通过合理的设计系统、配置硬件和软件系统使之有效地运行起来,成功实现了环流系统的升级扩容,解决了环流系统运力不足的情况,满足了工程实际情况的需要。
In the shield construction, each shield has its own specific range of adaptation. In the vast majority of cases, the existing shields are retrofitted or upgraded to meet the actual conditions of the project on the basis of a specific scope of adaptation. In this paper, in view of the lack of capacity of the shield circulation system, based on the existing equipment, through the reasonable design of the system, the configuration of the hardware and software system to make it operate effectively, the circulation system has been successfully upgraded and expanded to solve the problems of circulation system capacity Insufficient situation, to meet the needs of the actual situation of the project.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
本工程位于山东省菏泽市,先期建设的高层住宅地下室结构已施工完成,后增加连体地下车库,车库与高层住宅地下室结构需增设逃生通道,因高层住宅地下室结构已施工完成,且未给新
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
一、教学目标1.语言目标:复习被动语态2.能力目标:(1)理解如何在真实场景中应用被动语态。(2)通过观察与比较,培养学生学习语法的能力3.情感目标:(1)鼓励学生积极主动学
I.
根据工程实际情况分析风险发生的可能性,进而采取经济上、技术上和管理上的措施,尽可能避免风险发生,降低风险损失.
一 1970年的元旦刚过,铁道兵08师新兵团就结束了新兵训练。 晚饭后,新兵一连连长王国栋在连部主持召开了紧急会议,主要研究新兵分兵事情。 本来,新兵分兵没有什么复杂的,谁上哪个连队一分就完了。可是新兵一连有个特殊情况,一连有二百六十名新兵,有一半要分到施工连队,还有一半要分到机械连队。过去都是文化高的新兵先被机械连队挑走,剩下文化低的新兵分给施工连队。但这次要改变这种分兵方法,所以问题就来
<正> 1 前言 “电炉→连铸”短流程与传统的“高炉→转炉→连铸”长流程相比,具有投资省、能耗低、运输量少、劳动生产率高及有利于生产环境保护等特点,为国际钢铁界所重视。
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
不能不说的数字出版rn互联网自诞生以来,已迅速成为最迅捷的传播渠道,最快捷的搜索通路,在全球范围内对传统媒体和出版业带来巨大冲击,一项技术引爆了一场传媒的革命.在互联