在水电站建设中,由于开挖形成的高边坡,其稳定状态是影响水电站建设能否顺利进行的关键问题之一。Dapein(Ⅰ)水电站工程地质条件复杂,针对厂房开挖形成的岩质边坡,考虑了施工、地震、降雨条件,对边坡进行稳定性分析研究,分析各种工况下的安全程度,提出了边坡治理方案。
In the construction of hydropower stations, due to the high slope formed by excavation, the steady state is one of the key issues that affect the smooth progress of hydropower station construction. The engineering geological conditions of Dapein (Ⅰ) Hydropower Station are complex. Considering the rock slope formed by the excavation of the factory buildings, the stability analysis of the slope is taken into account in the construction, earthquake and rainfall conditions. The safety of the Dapein (Ⅰ) Slope management program.