论文部分内容阅读
伴随着我国的建筑业逐渐发展,不断进入更高的技术领域,客户对工期要求的提高,越来越多的大体积混凝土冬季建筑施工摆在面前。而大体积混凝土在冬季施工除了预防由于长期低温造成的被冻外,还要注意对温度的变化和出现裂缝的问题。应对其影响冬季施工的质量问题进行分析、讨论、解决,用正确的发放使其可以有效保证大体积混凝土在冬季施工中对整体工程的保证,提高工程质量。
With the gradual development of China’s construction industry, continue to enter the higher technical areas, increasing customer requirements on the construction period, more and more large-volume concrete winter construction in front of us. The construction of mass concrete in winter in addition to preventing long-term low temperature caused by freezing, but also pay attention to the temperature changes and the emergence of cracks. The quality problems affecting the winter construction should be analyzed, discussed and resolved. With the correct issuance, it can effectively ensure the mass concrete in the winter construction of the overall project to ensure and improve the quality of the project.