我们长庆油田所管的长兰输油管道有马惠、红惠、惠宁三段,全长308.9公里,在1978年7月1日至1979年6月15日间先后投入生产。由于种种原因,设计管输能力大于油田目前的产量。例如红惠段设计年输量为150万吨,而油田供油能力只有40多万吨;马惠段年设计量为300万吨,实际供油能力只有60万吨,惠宁段设计能量为400万吨,实际年输量为100万吨。为了维持管道正常运行采用反输弥补供油不足,能源消耗大,加热炉用油一小时达2吨,电力消耗每小时一千
The Changlan oil pipeline under our management in Changqing Oilfield is composed of three sections: Mahui, Honghui and Huining. The total length is 308.9 kilometers and it was put into production successively from July 1, 1978 to June 15, 1979. Due to various reasons, the design pipeline transportation capacity is greater than the current output of the oil field. For example, Honghui section design annual output of 1.5 million tons, while the oilfield oil supply capacity of only 40 million tons; Ma Hui paragraph design volume of 3 million tons, the actual oil supply capacity of only 600,000 tons, Huining section design energy of 4 million tons, the actual annual output of 1 million tons. In order to maintain the normal operation of the pipeline using reverse transport to make up for lack of fuel, energy consumption, furnace oil consumption up to 2 tons an hour, the power consumption of 1000 per hour