论文部分内容阅读
日前,由水利部产品质量标准研究所主持的“浙江江山白水坑水电站机组设计联络会”在富春江富士水电设备有限公司(双富公司)召开。来自浙江省水利水电勘测设计院、浙江省水电建筑监理公司和广州电器科学研究所等单位的专家、代表对该公司的制造工艺、质量控制措施及制造场地、设备等予以肯定。白水坑电站水轮发电机组将于近日在双富公司投料制造。
Recently, the “Zhejiang Jiangshan Baishuikeng Hydropower Unit Design Liaison Meeting” presided over by the Ministry of Water Resources Product Quality Standards Institute was held at Fuchunjiang Fuji Hydropower Equipment Co., Ltd. (Shuangfu Company). Experts and representatives from Zhejiang Water Conservancy and Hydropower Survey and Design Institute, Zhejiang Hydropower Construction Supervision Company and Guangzhou Institute of Electrical Apparatus and other units affirmed the company’s manufacturing processes, quality control measures, manufacturing sites, and equipment. The Baishuijing power station turbine generating unit will be manufactured at the Shuangfu Company in the near future.