论文部分内容阅读
现阶段,我国的水利工程的发展迅速,工程项目也随之增多,这样也就出现了许多问题。例如,设计人员技术水平不高,对施工现场没有进行详细的勘察等等,这些都是影响水利水电工程设计的重要因素,因此我们要针对问题,提出并找到问题的解决办法。保证水利水电工程能够按照工程预期进行工程施工。
At this stage, the rapid development of China’s water conservancy projects, engineering projects also will increase, so there have been many problems. For example, the designer’s technical level is not high, the construction site did not conduct a detailed survey, etc., which are all important factors affecting the design of water conservancy and hydropower projects, so we have to address the problem, propose and find a solution to the problem. Water conservancy and hydropower projects to ensure that projects can be expected in accordance with the engineering construction.