论文部分内容阅读
党和政府關於農業电气化的决議,預定要修建數以百計的小型的農村水电站,以期廣泛利用小河流和灌溉渠道上所蘊藏的水能。第四个五年計劃裏所拟定的建築計劃需要大量的劳動力和建築材料。这一情况提出了一个急待解决的問題,即改進小型水电站的結構使其更为合理,以期節約貴重的建築材料、減少建築工作量、縮短施工期限和改良机組等。由於烏茲別克苏維埃社会主义共和國領土內的地形複雜,“小型水能”可以利用的水头的
The party and government resolutions on electrification of agriculture are scheduled to build hundreds of small-scale rural hydropower stations with a view to making extensive use of hydropower contained in streams and irrigation channels. The building plans developed in the fourth five-year plan require a great deal of labor and building materials. This situation raises an urgent issue to be solved: improving the structure of small-scale hydropower stations to make it more reasonable, with a view to saving valuable building materials, reducing construction workload, shortening the construction period and improving the units. Due to the complex terrain in the territory of the Uzbek Soviet Socialist Republic, the “head of small water” can utilize