论文部分内容阅读
文章针对长洲枢纽至界首河段河床下切现状,分析了长洲水利枢纽坝下水文条件的变化情况,阐述了水文条件变化对航运造成的不利影响,并提出了相应的解决措施与建议。
In this paper, according to the present situation of river bed cutting from the Changzhou junction to the first section of the Yangtze River, the change of the hydrological conditions under the dam of Cheung Chau Water Control Project is analyzed. The unfavorable influence of the hydrological conditions on the shipping is expounded and corresponding solutions and suggestions are put forward.