论文部分内容阅读
农村劳力历来是安徽省水利兴修的主力军。从大规模的治淮运动到遍及各地的面上农田水利基本建设都离不开农民的劳务投入。据统计,1949~1992年安徽省投入水利建设的劳务达170亿工日,累计完成土石方180亿立方米,这项投入和取得的成效相当可观。毫无疑问,今后一段时期内,在国家资金投入有限和没有条件实施大范围机械化施工的情况下,劳务投入仍是水利兴修的主要措施之一。即便是经济发展了,国家对水利的投入增加了,水利也不可能全部由国家包建包管,还是要按照“水利为社会、社
Rural labor has always been the main force for water conservancy in Anhui Province. From large-scale control Huai campaign to all over the surface of farmland water conservancy capital construction are inseparable from the peasants’ labor input. According to statistics, in 1949-1992, the labor service invested in water conservancy construction in Anhui Province reached 17 billion working days and a total of 18 billion cubic meters of earth and stone were completed. The investment and the achievements made are quite impressive. Undoubtedly, labor input will remain as one of the main measures for water conservancy construction in the coming period with a limited investment of state funds and the lack of conditions for the implementation of a wide range of mechanized construction. Even though economic development has taken place, the state’s investment in water conservancy has been increased. Water conservancy can not all be managed by the state under the supervision of the government.