论文部分内容阅读
全面介绍张江集镇1#、2#(合建)雨水泵站大型泵房沉井采用排水下沉的施工方法,由于施工方法合理,施工技术措施适当,各参数选择正确、全面,终使大型沉井施工始终顺利进行。
This paper introduces the construction method of sinking sinking of large pumping stations of 1 # and 2 # rainwater pump stations in Zhangjiang Town, which are suitable for construction method and proper technical measures for construction. All parameters are selected correctly and comprehensively, Well construction has always been smooth.