从施工角度看,住宅建筑走预制装配的道路能扩大作业空间,简化现场施工工艺,争取平行作业的时间,缩短施工工期。但是,如果安装工程施工组织得不好,使工期拖长,则将失去其原有的意义。因此,提高多层装配式板材住宅的安装效率,使大量的住宅早日交付使用,发挥投资效果,这是值得重视的一个问题。在观测的十幢多层装配式板材住宅中,有八幢是五层建筑,每幢建筑面积近2200平米,有900多个预制构件,构件最大重量近
From a construction point of view, residential buildings can expand the working space by prefabricating roads, simplify on-site construction processes, strive for parallel operations, and shorten construction time. However, if the installation works are poorly organized and the construction period is prolonged, it will lose its original meaning. Therefore, improving the installation efficiency of multi-storey prefabricated flat-bed dwellings will enable a large number of dwellings to be delivered and used as soon as possible, so as to exert investment effects. This is a problem worthy of attention. Among the ten multistory prefabricated panel houses observed, eight are five-storey buildings, each with a building area of nearly 2,200 square meters. There are more than 900 prefabricated units, and the maximum weight of the units is near.