论文部分内容阅读
概括了澳大利亚新南威尔士州尾矿坝近年来的运行情况。提出了一种旨在提高理解水平并与州大坝安全管理局现行要求相符的新的管理计划。新计划包括:增加向大坝安全委员会报告的次数;制定更详细的设计要求;要求制定管理计划。介绍了拟采用的尾矿坝失事后果分级的细节以及关于初步设计、监督、废弃和管理等方面的指导原则。
Summarizes the operation of the tailings dam in New South Wales, Australia in recent years. Proposed a new management plan designed to raise the level of understanding and match the current requirements of the State Dam Safety Administration. The new plan includes: increasing the number of reports to the dam safety committee; developing more detailed design requirements; and calling for the development of a management plan. The details of the classification of the consequences of the tailings dam to be adopted and the guiding principles on preliminary design, supervision, disposal and management are introduced.