论文部分内容阅读
对翻浆冒泥的发生机理进行分析,并根据工程实际和承载力试验结果,确定运用石灰桩处理铁路路基翻浆冒泥。实践证明了此种方法的经济性和合理性。
Based on the engineering practice and bearing capacity test results, the lime pile was used to treat the subgrade mud and mud of railway subgrade. Practice has proved the economy and rationality of this method.