论文部分内容阅读
北京新型建筑材料总厂为适应城市建设迅速发展的要求,从1978年12月到1982年间,先后从瑞典和联邦德国引进了4条新型建材生产线。这些生产线设备庞大复杂,自动化程度较高,总重达2800吨。设备正常运转率的高低,与企业的经济效益密切相关。就我厂岩棉和纸面石膏板两条生产线而言,每小时设备故障所造成的经济损失,分别高达6000元和8000~9000元。为了用好管好这些引进设备,发挥其较大的技术效能,我们着重抓了以下工作。
In order to meet the requirements for the rapid development of urban construction, Beijing New Building Materials Plant has introduced four new building materials production lines from Sweden and the Federal Republic of Germany from December 1978 to 1982. The equipment of these production lines is large and complex with a high degree of automation, with a total weight of 2,800 tons. The normal operation rate of the equipment is closely related to the economic benefits of the company. For the two production lines of rock wool and gypsum board at our plant, the economic losses caused by equipment failure per hour are as high as 6,000 yuan and 8,000 to 9,000 yuan respectively. In order to make good use of these imported equipment and exert its greater technical efficiency, we have focused on the following tasks.