论文部分内容阅读
第16届亚运会开、闭幕式“亚运之舟”海心沙岛舞美工程风帆项目位于观礼台正前方。风帆装置主体结构采用圆柱架及圆钢管空间桁架体系,稳定性好、质量轻,可有效减轻风力影响。每组风帆的桅杆装置有升降机构,升降机构中安装拉力传感器、转速传感器、风力传感器等设备,使用风帆自动控制系统进行控制,从而保证帆板平稳、同步匀速和安全升降,同时实现各LED屏幕工作同步、连续。
16th Asian Games opening and closing ceremonies “Asian Games boat ” Haixin Sand Island Dance Project Sailing Project is located in front of the observatory. The main structure of the sail device adopts the space truss system of the cylindrical frame and the round steel tube, which has good stability and light weight, and can effectively reduce the impact of the wind. Each group of sail mast device has a lifting mechanism, the lifting mechanism installed tension sensors, speed sensors, wind sensors and other equipment, the use of automatic control system for wind sail control, so as to ensure smooth windsurfing, synchronous uniform speed and safety movements, while achieving the LED screen Work simultaneously, continuous.