清镇发电厂装机总容量65.8万千瓦,在上个世纪八、九十年代一直处于“贵州最大发电厂”的地位。由于我厂座落在“国家一级风景名胜”的红枫湖畔,即使在西部大开发及西电东送的大好形势下,不仅扩建四期工程已基本无望,还要在2003年拆除4台小机组。面临这种严峻的形势,作为贵州
Qingzhen Power Plant has a total installed capacity of 658,000 kilowatts, and has been in the position of “the largest power plant in Guizhou” in the 1980s and 1990s. As our factory is located at the edge of Hongfeng Lake, a “National Scenic Spot,” even under the favorable conditions of Western Development and West-to-East Power Transmission, the expansion of the fourth-phase project is almost hopeless, and it will be dismantled in 2003. 4 small units. Faced with this grim situation, as Guizhou