论文部分内容阅读
介绍了南疆线吐库二线施工中,采用振冲碎石桩处理饱和软土地基的施工方法,并结合振冲碎石桩工程设计原理进行了技术评价,以期为以后的碎石桩施工提供借鉴。
The construction method of the saturated soft soil foundation treated by the vibro replacement stone column is introduced in the construction of the second line of the southern bank of Xinjiang Uygur Autonomous Region. According to the design principle of the vibro replacement stone column, the technical evaluation is made to provide the later construction of the stone column Learn from