印度一些电炉炼钢厂家本厂无自备发电设施。因而受到电价上涨及供电难以保证的困扰。尤沙·马丁公司为贾姆舍德珀厂找到一种解决途径:1995年在该厂建成一座小高炉投产。此项目是为使该厂生产工艺成龙配套而于1994年起动的改扩建计划的一部分。贾厂30t电弧炉用铁水作炉料始于1995年2月。现在在电炉的一般装料中,铁水占55%,直接还原铁占15%,废钢占30%。这是印度首次这样使用小高炉。收效是:钢产量翻番,钢成本减半。为处理多余的铁水,还配一
Some electric furnace steel manufacturers in India have no self-owned power generation facilities. Which is troubled by the rising price of electricity and the difficulty of ensuring power supply. Yusha Martin found a solution for Jamspede Plant: A small blast furnace was put into operation at the plant in 1995. The project is part of a renovation and expansion project started in 1994 to bring the plant’s manufacturing process into a succession. Jia factory 30t electric arc furnace with hot metal charge began in February 1995. Now in the general charge of the electric furnace, 55% of hot metal, direct reduced iron 15%, scrap 30%. This is the first time that India has used a small blast furnace. Results are: doubling steel production, steel costs halved. To deal with the extra hot metal, but also with one