论文部分内容阅读
美国空军的首颗先进极高频军用通信卫星(AEHF-1)在经历了为期14个月的轨道调整之后,最终于2011年10月24日进入目标作业轨位。AEHF项目组工作人员将对该星开始为期约4个月的测试,逐一对星上全部系统进行详细地测试与检查。2012年年初,美国空军太空与导弹系统中心将把“AEHF-1”卫星操控
The U.S. Air Force’s first Advanced Extremely High Frequency Military Communications Satellite (AEHF-1) finally entered the target operational position on October 24, 2011 after undergoing a 14-month orbit adjustment. The AEHF project team will begin the test of the star for about 4 months, one by one to conduct a detailed test and inspection of all the systems on the star. In early 2012, the United States Air Force Space and Missile Systems Center will be “AEHF-1” satellite control