论文部分内容阅读
根据交通部下达的任务,《船体修理技术标准》的修订工作由上海立新船舶修造厂,船舶检验局上海办事处和上海海运局等三个单位派员组成修订小组负责进行,青山船厂曾参加一个时期的工作。标准草案修订完成后,由交通部标准计量研究所主持,于一九七八年十二月十日至十五日在长沙召开了“交通部《船体修理技
According to the mission issued by the Ministry of Communications, the revision work on the Technical Standard for Hull Repair was carried out by a team composed of three units: Shanghai Lixin Ship Repair Factory, Shanghai Ship Inspection Bureau Shanghai Office and Shanghai Maritime Transport Bureau. Aoyuan Shipyard had participated in one Period of work. After the revision of the standard draft was completed, it was chaired by the Institute of Standards and Metrology of the Ministry of Communications and held a ”Ministry of Transportation" hull repair technology from December 10 to 15, 1978