通过从地形地貌、动车性能、工程设置及投资等方面对不同的坡度方案进行分析、比选,确定宝兰客运专线最大坡度的取值。从地形地貌分析,20‰(个别25‰)坡度方案更加适应地形,节省工程投资;从动车性能分析,动车组功率大、质量轻,适应最大坡度能力强,20‰(个别25‰)坡度方案使得动车的牵引及制动性能发挥良好,同时也满足最小时间追踪间隔要求;从工程设置及投资分析,20‰(个别25‰)坡度方案主隧道长度合理、工程投资较为节省。本项目推荐最大坡度为20‰(个别25‰)是合理可行的。
Through the analysis of topography and geomorphology, motor car performance, engineering settings and investment, the different slope programs are analyzed and compared to determine the maximum slope value of Baolinshan Passenger Dedicated Line. According to the analysis of topography and geomorphology, the 20 ‰ (individual 25 ‰) slope scheme is more adaptable to the terrain and the project investment is saved. From the performance analysis of the moving car, the EMU has the advantages of large power, light weight, strong ability to adapt to the maximum gradient, 20 ‰ (25 ‰) Making the traction and braking performance of motor car play a good role, but also to meet the minimum time tracking interval requirements; from the project setup and investment analysis, 20 ‰ (individual 25 ‰) slope of the main tunnel length is reasonable, the project investment is more savings. It is reasonable and feasible to recommend a maximum slope of 20 ‰ (25 ‰ in each case) for this project.