强夯技术在分沂入沭调尾拦河坝坝基加固处理中的试验和应用

来源 :山东水利 | 被引量 : 0次 | 上传用户:ceolq
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 工程概况 分沂入沭调尾拦河大坝位于临沭县后河口村北,属大官庄枢纽的组成部分,它是将分沂入沭水道由入老沭河改为入大官庄枢纽,调沂沭河洪水经新沭河东去入海的骨干工程。拦河坝全长1600m,为均质土坝,最大坝高11.0m。近期蓄水位52.5m,一次蓄水量1500万m~3,总蓄水量4500万m~3;远期蓄水位55.0m,一次蓄水量5000万m~3,一年总蓄水量1.5亿m~3。 1 Project Overview Fengyi into Shu Tailing dam is located in Linshu County after the mouth of the village north of the village, is part of the Dacuanzhuang hub, which is sub-Yi Shu into the Shuhu into the official village Hub, transfer Yishu River flood through the new East River to the sea into the backbone of the project. The dam has a total length of 1,600m and is a homogeneous earth dam with a maximum dam height of 11.0m. The recent water level is 52.5 m, a water storage capacity is 15 million m 3, and the total water storage capacity is 45 million m 3. The long-term water storage level is 55.0 m and the water storage capacity is 50 million m 3. Quantity 150 million m ~ 3.
其他文献
目的:分析并探讨我县艾滋病病人的人群构成特点以及发展趋势,以期制定合理有效的艾滋病预防策略.方法:采用医学统计学软件以及调查问卷的方式方法来开展本次工作,收集我县在2
本文在研究多元智力、建构主义理论、工作过程导向等高职教育理论基础上,构建项目化学习质量评价体系结构,主要从工作过程导向项目化课程学习质量评价的基本原则、总体方案设
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
Unit31.in front of解读(1)介词短语,意思是“在……前面”。例如:There’s a tall tree in front of the house.房子前面有棵大树。In front of the gate are two lion stat
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
用气相色谱-原子发射光谱联用技术对多套石油加工装置的98个进出口的物料中硫化物的形态分布进行了研究.分别建立了汽油类、柴油类、水样和气体试样的色谱分离条件,以多种方
报道双层环氧粉末 (FBE)防腐体系的涂层性能、涂敷工艺方法和特点 ,探讨了在我国推广应用的可能性 ,认为这种双层防腐体系在性能上完全达到了聚烯烃与FBE结合的三层防护体系
英语素质教育是指在英语教学中培养学生对英语交际的驾驭能力,英语听、说、读、写的能力。它面向全体学生,以人为本,重视完整的人格教育和全面的素质提高。 English quality
发展性评价是学生学业评价的重要组成部分,正确运用发展性评价,对于有效改进学生学习、促进学生素质发展具有十分重要的现实意义。文章根据发展性评价理论,总结发展性评价内