摘要:在工程建设过程中,从施工准备、正式施工、竣工验收到交付使用,是一个长周期的复杂的质量、进度管理过程,为了让工程建设更加规范有序,也为了施工企业在市场竞争中证实自身质量的适用性和有效性,在不断总结经验的基础上,按中国目前的质量管理和质量保证系列标准的要求,施工企业应提供质量保证的证明文件。因此必须加强施工资料管理。笔者在此分别从几个不同的方向对工程资料管理做了详细的研究。
关键词:工程;施工;资料管理
Abstract: In the process of project construction, from the construction preparation, construction, completion and acceptance to the formal commissioning, it is a long cycle of complex quality, schedule management process, in order to make the project more normative and orderly, but also for the construction enterprise to prove their quality of the applicability and effectiveness of competition in the market, based on constantly sum up experience, according to China's current quality management and quality assurance standards requirements, the construction enterprise shall provide the quality assurance documents. Therefore, must strengthen the construction of information management. The author separately from several different directions of engineering data management are studied in detail.
Keywords: engineering construction; information management;
中圖分类号:TU71
一、完善制度,明确责任对建筑工程进行档案管理是很必要也十分重要的,管理过程应当是有目标、有计划、有落实、有责任的活动。所以,承建单位必须建立由副经理或者总工程师领导,质量生成或者工程档案部门负责专管,下面的各级主管相应的分片领导,由档案管理者以及项目经理负责,由施工管理者来具体落实,并且对各级各类人员的权责予以明确规定。对于大型的工程项目部门一定有现场的档案管理员,对于中型或者小型项目部门,应当有兼职人员对资料进行收集以及整理。企业应当适时对档案工作者进行业务相关的培训,提高其业务水平以及工作质量。依照档案资料管理的重点在现场的特点,加强建立完善的工程档案编制、收集、归档以及整理的制度。
二、技术内业资料要求完整
不完整的技术内业资料将会导致片面性,不能系统地、全面地了解单位工程的质量状况。技术资料中容易忽略的有:刚性防水屋面细石混凝土强度试块、楼地面基层混凝土强度试块、抗渗用混凝土试块、楼地面面层水泥砂浆试块。如果缺少这部分混凝土、砂浆试块强度,不但使工程技术资料不完整,而且给准确核定工程质量等级增加了难度。如果一个单位工程有几个分包单位分别负责施工几个分项或分部工程时,总包单位应对单位工程质量全面负责,各分包单位应按国家标准《建筑安装工程质量检验评定标准》(GBJ301-88)第4.0.4条规定“检验评定各自承建的分项、分部工程质量等级和整理资料,将评定结果及资料交总包单位,参加单位工程的评定”。个别工程水、电分部工程及装饰工程中的高级装饰,由建设单位分包出去,出现这种情况,应由建设单位向各分包单位收集工程技术资料,使整个单位工程技术资料完整,参加该单位工程质量等级的评定。
三、加强工程资料的归档管理在系统化和网络化的基础上,我们应同时加强工程资料中纸质文档的归档管理。工程技术资料的归档质量和时效直接影响单位工程的资科交接和竣工决算,所以施工资料必须严格按照文件归档标准进行归档。归档文件必须完整、准确、系统,能够反映工程建设活动的全过程。归档的文件必须经过分类整理,并应组成符合要求的案卷。在工程资料的归档中,立卷应遵循工程文件的自然形成规律,保持卷内文件的有机联系,便于档案的管理和利用。施工文件可按单位工程、分部工程、专业、阶段等组卷;竣工图按单位工程、专业组卷、竣工验收文件按单位工程、专业等组卷,通过以上方式,我们可以实现工程资料保管和查找中的便捷。
四、实施科学管理制度 建设单位、施工单位、监理单位从建筑工程项目施工至交付使用,应将归档的文件、记录、图纸、表格和其他形式的资料进行收集和整理,并逐步实现计算机管理。 我们应结合工程实际,完善检测手段,加强施工过程管理,提高科技含量的检测方法,充分考虑建筑资料管理的科学化、规范化和信息化,加强建设各方主体对资料管理的职责。建议对工程施工资料进行计算机管理,要求施工单位配备计算机和工程技术资料软件,做好管理人员在各个方面的再教育,提高整体素质,进行全面的施工质量控制。如施工图设计,应在施工前由技术部门完成,施工单位技术负责人审批,填写好《施工组织设计(方案)审批表》,并报工程监理单位和建设单位批准后实施。应做好建筑安装工程重要设备的系统调试、空载和负荷运转的安装,只有做好图纸会审、施工组织设计、技术交底、隐蔽验收、分部分项单位工程验收、竣工验收、质量回访等一系列工作,作出科学性和系统性的管理,才能收到显着的效果,以确保建筑工程资料的真实性。
五、工程建设同步,进行全程监控1、及时对相关人员进行培训,提高工作质量一切工程合同中都对其档案的移交进行了明文规定,施工单位作为档案的最直接的接触方,施工单位能否适应档案管理相应的要求以及标准,树立档案意识等都会对档案的质量产生很大影响。有些单位仅仅较为重视入厂安全,却缺乏档案管理方面的培训。因此,必须及早对相关监理人员进行培训,树立档案思想,这样才能够确保资料能够收集齐全并且质量较好。同时,对施工单位相关人员开展文件整理、档案管理、交工技术等培训,加强建档以及归档意识,熟悉其归档要求、收集范围、整理标准等。
2、资料分发时必须加强监控基础建设工程在施工过程中,承建方的资料室在工程竣工以及档案验收中起着十分重要的作用,同时负责图纸以及其他资料的发放。未来确保竣工时所需档案高质量,相应的管理者应当亲自参与监控资料分发的工作,分发前首先将需归档部分保存之后再分发,特别是像详勘这些数目有限的资料,必须妥善保管。这样才能够在保持图纸清洁的同时使归档资料比较齐全。3、立项时应当加强资料监控工程项目在立项、审批、勘察之前,相应的管理部门并没有成立,自然就缺少档案管理者。而工程准备时相关材料往往比较分散,部分文件在其文书相关部门,部分文件放置在规划部,并没有经过应有文书处理程序,同时,投招标以及勘察文件又放于工程管理部。如果没有对上述比较分散的相关资料进行及时收集,久而久之,会使收集上述文件的难度加大,甚至可能导致文件丢失。所以,在工程项目立项的前期,就应当及时介入档案的收集以及整理,由专人负责。六、施工过程中收集和填报资料的注意事项1、收集材料质量证明文件
在施工过程中不断会购进各种材料,就需要收集每种材料的出厂合格证及有效的检测报告(有CMA标志的),必须是 原件。有效证件的时间、数量及品种规格必须与材料进场的时间相符,特别是水泥要有28天强度的出厂检验单;钢材的标识、规格与出厂合格证相符。2、填报资料
对于质检资料的填报需填写监理规范用表,书写要求规范,不能涂改,采用耐久性强的书写材料,如碳素墨水,或现在常用的中性 笔。监理表格一般一式三份、隐蔽记录与工序表格一式两份。按照规范标准的相应工序验收内容填写表格,不同的监理对资料的要求不完全一样,填写报验资料前应 积极与监理沟通,达成一致后填写。3、收集试验报告
试验报告是工程资料的重要组成部分,属工程质量保证材料,70%的试验报告为自检报告,30%为见证取样报告,由市政质 监站委托的检测中心出据,这30%为强制规定,在进入每道工序施工前后都有相应的试验,需要熟悉各种试验,试验完成后的试验报告应收集完整,跟资料中的桩 号、时间、混凝土浇注记录、施工记录等相符合,工程中的大多数资料都相互联系,不仅相符,汇总和评定记录也需要根据试验报告进行填写。
七、发挥合同的法律效应档案管理部门应当参与起草合同的相应管理工作,将文件材料的归档以及积累当作合同中的重要内容独立为一条款,明确要求竣工文件材料相应的验收时间、质量以及份数、副本内容、归档范围,使相应的承建单位也对档案管理有足够的认识与重视,这样以来,就以法律形式保证了归档工作的落到实处。八、结束语
综上所述,工程资料在工程施工中有着举足轻重的作用,同时,我们通过收集归档将其转为信息资源,而这些资源又能通过资料工作者之手将其提供给工程建设人员对新项目或类似项目进行有益参考、对比、借鉴,为进一步降低成本提高生产效率服务,为了企业的健康发展我们必须要认识到工程内业资料的重要性,进而认真地做好这项工作。
关键词:工程;施工;资料管理
Abstract: In the process of project construction, from the construction preparation, construction, completion and acceptance to the formal commissioning, it is a long cycle of complex quality, schedule management process, in order to make the project more normative and orderly, but also for the construction enterprise to prove their quality of the applicability and effectiveness of competition in the market, based on constantly sum up experience, according to China's current quality management and quality assurance standards requirements, the construction enterprise shall provide the quality assurance documents. Therefore, must strengthen the construction of information management. The author separately from several different directions of engineering data management are studied in detail.
Keywords: engineering construction; information management;
中圖分类号:TU71
一、完善制度,明确责任对建筑工程进行档案管理是很必要也十分重要的,管理过程应当是有目标、有计划、有落实、有责任的活动。所以,承建单位必须建立由副经理或者总工程师领导,质量生成或者工程档案部门负责专管,下面的各级主管相应的分片领导,由档案管理者以及项目经理负责,由施工管理者来具体落实,并且对各级各类人员的权责予以明确规定。对于大型的工程项目部门一定有现场的档案管理员,对于中型或者小型项目部门,应当有兼职人员对资料进行收集以及整理。企业应当适时对档案工作者进行业务相关的培训,提高其业务水平以及工作质量。依照档案资料管理的重点在现场的特点,加强建立完善的工程档案编制、收集、归档以及整理的制度。
二、技术内业资料要求完整
不完整的技术内业资料将会导致片面性,不能系统地、全面地了解单位工程的质量状况。技术资料中容易忽略的有:刚性防水屋面细石混凝土强度试块、楼地面基层混凝土强度试块、抗渗用混凝土试块、楼地面面层水泥砂浆试块。如果缺少这部分混凝土、砂浆试块强度,不但使工程技术资料不完整,而且给准确核定工程质量等级增加了难度。如果一个单位工程有几个分包单位分别负责施工几个分项或分部工程时,总包单位应对单位工程质量全面负责,各分包单位应按国家标准《建筑安装工程质量检验评定标准》(GBJ301-88)第4.0.4条规定“检验评定各自承建的分项、分部工程质量等级和整理资料,将评定结果及资料交总包单位,参加单位工程的评定”。个别工程水、电分部工程及装饰工程中的高级装饰,由建设单位分包出去,出现这种情况,应由建设单位向各分包单位收集工程技术资料,使整个单位工程技术资料完整,参加该单位工程质量等级的评定。
三、加强工程资料的归档管理在系统化和网络化的基础上,我们应同时加强工程资料中纸质文档的归档管理。工程技术资料的归档质量和时效直接影响单位工程的资科交接和竣工决算,所以施工资料必须严格按照文件归档标准进行归档。归档文件必须完整、准确、系统,能够反映工程建设活动的全过程。归档的文件必须经过分类整理,并应组成符合要求的案卷。在工程资料的归档中,立卷应遵循工程文件的自然形成规律,保持卷内文件的有机联系,便于档案的管理和利用。施工文件可按单位工程、分部工程、专业、阶段等组卷;竣工图按单位工程、专业组卷、竣工验收文件按单位工程、专业等组卷,通过以上方式,我们可以实现工程资料保管和查找中的便捷。
四、实施科学管理制度 建设单位、施工单位、监理单位从建筑工程项目施工至交付使用,应将归档的文件、记录、图纸、表格和其他形式的资料进行收集和整理,并逐步实现计算机管理。 我们应结合工程实际,完善检测手段,加强施工过程管理,提高科技含量的检测方法,充分考虑建筑资料管理的科学化、规范化和信息化,加强建设各方主体对资料管理的职责。建议对工程施工资料进行计算机管理,要求施工单位配备计算机和工程技术资料软件,做好管理人员在各个方面的再教育,提高整体素质,进行全面的施工质量控制。如施工图设计,应在施工前由技术部门完成,施工单位技术负责人审批,填写好《施工组织设计(方案)审批表》,并报工程监理单位和建设单位批准后实施。应做好建筑安装工程重要设备的系统调试、空载和负荷运转的安装,只有做好图纸会审、施工组织设计、技术交底、隐蔽验收、分部分项单位工程验收、竣工验收、质量回访等一系列工作,作出科学性和系统性的管理,才能收到显着的效果,以确保建筑工程资料的真实性。
五、工程建设同步,进行全程监控1、及时对相关人员进行培训,提高工作质量一切工程合同中都对其档案的移交进行了明文规定,施工单位作为档案的最直接的接触方,施工单位能否适应档案管理相应的要求以及标准,树立档案意识等都会对档案的质量产生很大影响。有些单位仅仅较为重视入厂安全,却缺乏档案管理方面的培训。因此,必须及早对相关监理人员进行培训,树立档案思想,这样才能够确保资料能够收集齐全并且质量较好。同时,对施工单位相关人员开展文件整理、档案管理、交工技术等培训,加强建档以及归档意识,熟悉其归档要求、收集范围、整理标准等。
2、资料分发时必须加强监控基础建设工程在施工过程中,承建方的资料室在工程竣工以及档案验收中起着十分重要的作用,同时负责图纸以及其他资料的发放。未来确保竣工时所需档案高质量,相应的管理者应当亲自参与监控资料分发的工作,分发前首先将需归档部分保存之后再分发,特别是像详勘这些数目有限的资料,必须妥善保管。这样才能够在保持图纸清洁的同时使归档资料比较齐全。3、立项时应当加强资料监控工程项目在立项、审批、勘察之前,相应的管理部门并没有成立,自然就缺少档案管理者。而工程准备时相关材料往往比较分散,部分文件在其文书相关部门,部分文件放置在规划部,并没有经过应有文书处理程序,同时,投招标以及勘察文件又放于工程管理部。如果没有对上述比较分散的相关资料进行及时收集,久而久之,会使收集上述文件的难度加大,甚至可能导致文件丢失。所以,在工程项目立项的前期,就应当及时介入档案的收集以及整理,由专人负责。六、施工过程中收集和填报资料的注意事项1、收集材料质量证明文件
在施工过程中不断会购进各种材料,就需要收集每种材料的出厂合格证及有效的检测报告(有CMA标志的),必须是 原件。有效证件的时间、数量及品种规格必须与材料进场的时间相符,特别是水泥要有28天强度的出厂检验单;钢材的标识、规格与出厂合格证相符。2、填报资料
对于质检资料的填报需填写监理规范用表,书写要求规范,不能涂改,采用耐久性强的书写材料,如碳素墨水,或现在常用的中性 笔。监理表格一般一式三份、隐蔽记录与工序表格一式两份。按照规范标准的相应工序验收内容填写表格,不同的监理对资料的要求不完全一样,填写报验资料前应 积极与监理沟通,达成一致后填写。3、收集试验报告
试验报告是工程资料的重要组成部分,属工程质量保证材料,70%的试验报告为自检报告,30%为见证取样报告,由市政质 监站委托的检测中心出据,这30%为强制规定,在进入每道工序施工前后都有相应的试验,需要熟悉各种试验,试验完成后的试验报告应收集完整,跟资料中的桩 号、时间、混凝土浇注记录、施工记录等相符合,工程中的大多数资料都相互联系,不仅相符,汇总和评定记录也需要根据试验报告进行填写。
七、发挥合同的法律效应档案管理部门应当参与起草合同的相应管理工作,将文件材料的归档以及积累当作合同中的重要内容独立为一条款,明确要求竣工文件材料相应的验收时间、质量以及份数、副本内容、归档范围,使相应的承建单位也对档案管理有足够的认识与重视,这样以来,就以法律形式保证了归档工作的落到实处。八、结束语
综上所述,工程资料在工程施工中有着举足轻重的作用,同时,我们通过收集归档将其转为信息资源,而这些资源又能通过资料工作者之手将其提供给工程建设人员对新项目或类似项目进行有益参考、对比、借鉴,为进一步降低成本提高生产效率服务,为了企业的健康发展我们必须要认识到工程内业资料的重要性,进而认真地做好这项工作。