论文部分内容阅读
一前言金泽市有末和犀川两个净水厂,1981年石川县支援供一部分水。截至1992年,金泽市全部供水能力为:末水厂慢速系统40000m~3/d,快速系统65000m~3/d;犀川水厂快速系统100000m~3/d;石川县供水101570m~3/d;合计306570m~3/d。近年来由于需水量减低及石川县供水
I. INTRODUCTION There are two water purification plants in Horozawa City and Segawa River in Kanazawa City. In 1981, Ishikawa Prefecture supported a portion of the water supply. As of 1992, the total water supply capacity of Kanazawa City was: 40000m~3/d for the slow water system at the end of the water plant, 65000m~3/d for the fast system, 100000m~3/d for the rapid system for the Saita River Water Plant, and 101570m~3 for the Ishikawa Water Supply. d; Total 306570m~3/d. In recent years due to reduced water requirements and water supply in Ishikawa Prefecture