经水电部和甘肃省人民政府商定,由水电部水电建设总局和甘肃省建委共同主持召开的黄河大峡水电站初步设计审查会议于一九八二年十一月二十二日至十二月一日在兰州召开.参加会议的有国家经委基建办;水电部部分直属设计、施工单位;水科院;西北电管局等四十一个单位,共一百六十余位代表.
As agreed by the Ministry of Water Resources and Gansu Provincial People’s Government, the preliminary design review meeting of the Yellow River Daxia Hydropower Station co-sponsored by the Ministry of Water Resources and Hydropower Engineering and Gansu Provincial Construction Commission took place from November 22 to December 1, 1982 Held in Lanzhou.At the meeting, there were the State Economic and Trade Office of the State Economic and Trade Office; some departments directly under the Ministry of Mines, including the design and construction units; the Hydrology Institute; and the Northwest Electricity Administration, a total of more than 160 delegates.