萍乡矿务局高坑发电厂是一座随着改革而诞生、采用当初世界上先进的流化床燃烧技术、利用煤碎石和劣质煤发电的坑口电厂。她位于江西省萍乡市东郊15km处的江南最大的煤矿──高坑煤矿的研石山下。自1982年5月第一台机组正式投产发电至今,现已累计发电15亿kwh,实现利润4200万
The Pingxiang Mining Bureau Gaokeng Power Plant is a crater power plant that was born with reforms and adopted the world’s most advanced fluidized bed combustion technology and uses coal crushed stone and low-quality coal to generate electricity. She is located in Jiangnan, the largest coal mine in southern Jiangxi, 15km east of Pingxiang City, Jiangxi Province. Since the first unit was formally put into production in May 1982, it has cumulatively generated 1.5 billion kwh and realized a profit of 42 million.