Abstract : in recent years, with China's social and economic development, housing construction also obtained the corresponding development space, it is not only a national, a manifestation of social progress, it is the important stage of development of housing industry, housing construction engineering supervision is to assure the construction enterprises or units, social, national and the interests of the people of the important way. How to do well supervision work is our urgent need to consider the issue, this article combines real work experience of the author, housing construction project supervision work content are discussed.
Key words : Housing construction; engineering supervision; way;
中图分类号:K826.16文献标识码:A 文章编号:
房屋建筑工程的质量和人们的生产、生活息息相关,关系到人民的生命财产安全和社会的稳定,与企业本身的经济效益和社会的经济效益、生态效益密切相关,是国民经济的增长的基础。而房屋建筑工程监理工作则是保证建筑施工企业或单位、社会、国家以及人民利益的重要途径。房屋建筑工程施工的项目很多,每个工程项目都必须要有监理,怎样做好监理工作是我们迫切需要考虑的问题。
一、工程监理的概念
所谓工程建设监理,就是通过对工程建设者的行为进行监控、督导和评价,并采取相应的管理措施,保证工程建设行为符合国家法律、法规和有关政策,制止建设行为随意性和盲目性,促使工程建设费用、进度、质量按计划实现,确保工程建设科学推进,并达到节约费用、保持质量、高效运作的目的。
二、房屋建筑工程监理的主要内容
1、投资审核
甲乙双方的承包合同和投标报价,分解制成工程量清单和造价表、进度款拨付计划表等。而承包商根据工程量编报月进度款申请,专业监理人员各自核准本专业的已完工并质量合格的工程量,规整工程的正常进度量,根据详细的造价清单计算出应付额,报告总监理。总监核准后签发月进度款付款通知,由甲方审核拨付,无监理签发的付款通知,甲方不付款。
2、质量控制
质量控制是监理的主要工作,内容包括:监理工程师质量管理工作的指导原则是预防为主和事前控制,抓好图纸会审 技术交底 工序管理各个环节,采取惩教并举以教为主,样板导引,用规范标准与数据说话。 检查的土建、 暖卫、 电气和外观等方面存在的质量问题要督促改进,对施工中的钢筋混凝土等材料的配用及检测要核实,做好工程量的分配和质量检查,保障施工进度的正常进行。
3、进度监管
将审批过的施工总进度计划目标书,分解为各季度、月、周进度计划;依据分解的进度计划按时检查、监督与管理协商,在相关的例会上及时提出整改和调整措施并检查落实;对于完不成进度计划并严重滞后的施工工期,监理要与建设方协商,按照合同采取进一步的措施(例如索赔,赶工等);对于非承包商原因的工期延误,应及时予以办理签证并报告甲方代表;进度控制是监理月报的主要内容,并要求用数据和表格说话。
4、竣工验收
施工单位按照施工进度表的进度划分以及设计文件和资料全部完成了施工任务后,监理依据有关法律、法规、工程建设强制性标准、设计文件及施工合同,对承包单位报送的竣工资料进行审查,并对工程质量进行竣工预验收(也称初步验收),对使用功能复杂的工程还要进行系统功能试验、检测或系统联动试验。竣工预验收一般应有勘察设计单位参与。对于存在的问题,应及时要求承包单位整改,并对照整改通知单逐项检查落实。竣工预验收合格后,由项目总监签署工程竣工报验单,并在此基础上向建设单位提交工程质量评估报告,该报告应由项目总监和监理单位技术负责人审核签字。
5、工程质量保修
监理单位依据委托合同书约定的工程质量保修期的时间范围和内容开展工作,监理单位根据现场实际施工情况和人员分配,安排监理人员对建设单位提出的工程质量缺陷再次进行详细地检查和记录,并对承包单位发出修复通知,待施工单位修复合格后进行修复质量验收并予以签认。监理人员应对工程质量缺陷原因进行调查分析并确定责任归属,对非承包单位原因造成的工程质量缺陷,监理人员应该核实修复工程的费用和签署工程款支付证书,及时与建设单位代表沟通后报送相关资料实地查验工程质量,听取政府质监部门对监理工作的评价,并在竣工验收报告上签署意见。
三、加强房屋建筑工程监理工作的有效途径
1、组建现场监理机构
监理机构运行的好坏,一个十分重要的因素就是监理队伍的综合素质和团结协作能力。在进入现场前,总监理工程师要结合投标承诺,认真了解专业划分、工程难度等情况,对进场监理人员的工作能力也要有个初步的估计和掌握,并采取相应措施最大限度地发挥各自的特长,以此来保证各监理工作岗位之间的相互衔接,分工协作。要配备完善的专业监理人员,这样才能保证监理工作的顺利开展。如果专业监理人员配备不齐,其造成的后果就是总监理工程师四处救火、疲于奔命。在这样的状况下,工作时疏忽和隐患的产生在所难免,业主的满意度也将随之下降。
2、实施全方位全过程的建设监理,
一般建设监理工作主要限于施工阶段管理,要想充分的发挥监理的职能,应使监理工作逐步涉及可行性研究、设计、招投标、施工等阶段,进行多方位、全过程的综合管理。只授予施工阶段质量控制权的工程,监理人员控制质量的难度就要高于实施全面监理的工程。这是因为业主未授予监理投资控制权,承包商拿工程款不需经过监理批准,不管工程质量优劣都一样能拿到钱,导致监理人员不能有效地对工程质量进行监控。倘若业主授予监理投资控制权,只对检验合格的工程签发付款通知书,监理工作就不会那么吃力,监理人员就可以运用经济手段来约束施工单位的行为,从而更有效地保证工程质量。
3、保证关键工序的工程质量
监理工作的重点要放在事前控制,这是监理职能的要求。关键部位、关键工序的隐蔽、施工,监理人员要实行旁站、巡视或平行检查,不能等到即成事实,待施工质检报验后,才“秋后算帐”。因为关键部位、关键工序一旦形成,轻则做返工处理(如钢筋尚未隐蔽)影响工期,重则违反强制性条文,留下工程质量隐患或永久缺陷。一旦出现需要采取事后補救的情况,虽然主要责任在施工方,但也从侧面反映了监理的业务水平、监理的深度、事前控制等方面能力的不足。所以,制定针对性强、符合所监工程特点的监理旁站计划,并在实际监理活动中予以落实,更好地体现监理企业综合水平和现场监理人员管理良好素质。
4、培养高素质的建筑工程监理人员
工程建设监理是一种高智能的技术服务,要规范化地开展监理工作,就必须有一支高素质的监理队伍。目前,我国的监理事业发展缓慢,一个重要原因就是缺乏一批既懂得理论知识,又具有工程实践经验,既懂法律、经济知识,又具有组织协调能力的复合型人才。因此,应多层次、多渠道地举办监理学习班、培训班,加速培养一批高素质的工程建设监理人才,为规范化开展监理工作创造必要条件。
5、实行监理报告制度
开展监理单位向管理部门定期报告与紧急报告结合的制度。对于施工现场的日常情况,要求项目监理机构定期向管理部门报告,便于管理部门掌握施工动态;对于发现质量和安全事故隐患的,项目监理机构应当要求施工单位改正或者停工,施工单位拒不执行的,项目监理机构应当立即向建设行政管理部门或者其他有关部门报告。管理部门必须立即到场处置,避免发生事故。
四、结语
房屋建筑工程的质量问题对我国经济的健康稳定发展有着直接而重大的影响。房屋建筑工程监理工作是一项极其重要的工作,任重而道远,需要所有参与者的共同努力,不断提升工程监理水平,进而达到提高工程质量的目的,使我国的房屋建筑工程发展水平上一个新台阶。
参考文献:
[1]吕剑.房屋建筑施工质量监理探讨[J].中国城市经济,2010,(06)
[2]李良伟.建筑工程监理与施工技术的相互促进[J].科学之友,2010,(01)
[3]李博聪.充分发挥工程监理作用确保工程质量[J].科技致富向导, 2011,(21)
[4]赵军,张志强.浅谈建筑工程项目全面质量管理[J].民营科技,2011,(07)
关键词:房屋建筑;工程;监理;途径
Abstract : in recent years, with China's social and economic development, housing construction also obtained the corresponding development space, it is not only a national, a manifestation of social progress, it is the important stage of development of housing industry, housing construction engineering supervision is to assure the construction enterprises or units, social, national and the interests of the people of the important way. How to do well supervision work is our urgent need to consider the issue, this article combines real work experience of the author, housing construction project supervision work content are discussed.
Key words : Housing construction; engineering supervision; way;
中图分类号:K826.16文献标识码:A 文章编号:
房屋建筑工程的质量和人们的生产、生活息息相关,关系到人民的生命财产安全和社会的稳定,与企业本身的经济效益和社会的经济效益、生态效益密切相关,是国民经济的增长的基础。而房屋建筑工程监理工作则是保证建筑施工企业或单位、社会、国家以及人民利益的重要途径。房屋建筑工程施工的项目很多,每个工程项目都必须要有监理,怎样做好监理工作是我们迫切需要考虑的问题。
一、工程监理的概念
所谓工程建设监理,就是通过对工程建设者的行为进行监控、督导和评价,并采取相应的管理措施,保证工程建设行为符合国家法律、法规和有关政策,制止建设行为随意性和盲目性,促使工程建设费用、进度、质量按计划实现,确保工程建设科学推进,并达到节约费用、保持质量、高效运作的目的。
二、房屋建筑工程监理的主要内容
1、投资审核
甲乙双方的承包合同和投标报价,分解制成工程量清单和造价表、进度款拨付计划表等。而承包商根据工程量编报月进度款申请,专业监理人员各自核准本专业的已完工并质量合格的工程量,规整工程的正常进度量,根据详细的造价清单计算出应付额,报告总监理。总监核准后签发月进度款付款通知,由甲方审核拨付,无监理签发的付款通知,甲方不付款。
2、质量控制
质量控制是监理的主要工作,内容包括:监理工程师质量管理工作的指导原则是预防为主和事前控制,抓好图纸会审 技术交底 工序管理各个环节,采取惩教并举以教为主,样板导引,用规范标准与数据说话。 检查的土建、 暖卫、 电气和外观等方面存在的质量问题要督促改进,对施工中的钢筋混凝土等材料的配用及检测要核实,做好工程量的分配和质量检查,保障施工进度的正常进行。
3、进度监管
将审批过的施工总进度计划目标书,分解为各季度、月、周进度计划;依据分解的进度计划按时检查、监督与管理协商,在相关的例会上及时提出整改和调整措施并检查落实;对于完不成进度计划并严重滞后的施工工期,监理要与建设方协商,按照合同采取进一步的措施(例如索赔,赶工等);对于非承包商原因的工期延误,应及时予以办理签证并报告甲方代表;进度控制是监理月报的主要内容,并要求用数据和表格说话。
4、竣工验收
施工单位按照施工进度表的进度划分以及设计文件和资料全部完成了施工任务后,监理依据有关法律、法规、工程建设强制性标准、设计文件及施工合同,对承包单位报送的竣工资料进行审查,并对工程质量进行竣工预验收(也称初步验收),对使用功能复杂的工程还要进行系统功能试验、检测或系统联动试验。竣工预验收一般应有勘察设计单位参与。对于存在的问题,应及时要求承包单位整改,并对照整改通知单逐项检查落实。竣工预验收合格后,由项目总监签署工程竣工报验单,并在此基础上向建设单位提交工程质量评估报告,该报告应由项目总监和监理单位技术负责人审核签字。
5、工程质量保修
监理单位依据委托合同书约定的工程质量保修期的时间范围和内容开展工作,监理单位根据现场实际施工情况和人员分配,安排监理人员对建设单位提出的工程质量缺陷再次进行详细地检查和记录,并对承包单位发出修复通知,待施工单位修复合格后进行修复质量验收并予以签认。监理人员应对工程质量缺陷原因进行调查分析并确定责任归属,对非承包单位原因造成的工程质量缺陷,监理人员应该核实修复工程的费用和签署工程款支付证书,及时与建设单位代表沟通后报送相关资料实地查验工程质量,听取政府质监部门对监理工作的评价,并在竣工验收报告上签署意见。
三、加强房屋建筑工程监理工作的有效途径
1、组建现场监理机构
监理机构运行的好坏,一个十分重要的因素就是监理队伍的综合素质和团结协作能力。在进入现场前,总监理工程师要结合投标承诺,认真了解专业划分、工程难度等情况,对进场监理人员的工作能力也要有个初步的估计和掌握,并采取相应措施最大限度地发挥各自的特长,以此来保证各监理工作岗位之间的相互衔接,分工协作。要配备完善的专业监理人员,这样才能保证监理工作的顺利开展。如果专业监理人员配备不齐,其造成的后果就是总监理工程师四处救火、疲于奔命。在这样的状况下,工作时疏忽和隐患的产生在所难免,业主的满意度也将随之下降。
2、实施全方位全过程的建设监理,
一般建设监理工作主要限于施工阶段管理,要想充分的发挥监理的职能,应使监理工作逐步涉及可行性研究、设计、招投标、施工等阶段,进行多方位、全过程的综合管理。只授予施工阶段质量控制权的工程,监理人员控制质量的难度就要高于实施全面监理的工程。这是因为业主未授予监理投资控制权,承包商拿工程款不需经过监理批准,不管工程质量优劣都一样能拿到钱,导致监理人员不能有效地对工程质量进行监控。倘若业主授予监理投资控制权,只对检验合格的工程签发付款通知书,监理工作就不会那么吃力,监理人员就可以运用经济手段来约束施工单位的行为,从而更有效地保证工程质量。
3、保证关键工序的工程质量
监理工作的重点要放在事前控制,这是监理职能的要求。关键部位、关键工序的隐蔽、施工,监理人员要实行旁站、巡视或平行检查,不能等到即成事实,待施工质检报验后,才“秋后算帐”。因为关键部位、关键工序一旦形成,轻则做返工处理(如钢筋尚未隐蔽)影响工期,重则违反强制性条文,留下工程质量隐患或永久缺陷。一旦出现需要采取事后補救的情况,虽然主要责任在施工方,但也从侧面反映了监理的业务水平、监理的深度、事前控制等方面能力的不足。所以,制定针对性强、符合所监工程特点的监理旁站计划,并在实际监理活动中予以落实,更好地体现监理企业综合水平和现场监理人员管理良好素质。
4、培养高素质的建筑工程监理人员
工程建设监理是一种高智能的技术服务,要规范化地开展监理工作,就必须有一支高素质的监理队伍。目前,我国的监理事业发展缓慢,一个重要原因就是缺乏一批既懂得理论知识,又具有工程实践经验,既懂法律、经济知识,又具有组织协调能力的复合型人才。因此,应多层次、多渠道地举办监理学习班、培训班,加速培养一批高素质的工程建设监理人才,为规范化开展监理工作创造必要条件。
5、实行监理报告制度
开展监理单位向管理部门定期报告与紧急报告结合的制度。对于施工现场的日常情况,要求项目监理机构定期向管理部门报告,便于管理部门掌握施工动态;对于发现质量和安全事故隐患的,项目监理机构应当要求施工单位改正或者停工,施工单位拒不执行的,项目监理机构应当立即向建设行政管理部门或者其他有关部门报告。管理部门必须立即到场处置,避免发生事故。
四、结语
房屋建筑工程的质量问题对我国经济的健康稳定发展有着直接而重大的影响。房屋建筑工程监理工作是一项极其重要的工作,任重而道远,需要所有参与者的共同努力,不断提升工程监理水平,进而达到提高工程质量的目的,使我国的房屋建筑工程发展水平上一个新台阶。