历经7年3个月之久,随着最后一榀初支拱架封闭成环,国内最大横断面双线铁路隧道—兰渝铁路新城子隧道顺利贯通。新城子隧道因地质原因,建设过程之艰辛,施工作业之困难,世所罕见。高地应力、软岩大变形、超大断面各种不利因素叠加在一起,成洞非常困难。施工过程中,国内外隧道施工专家高度关注,一致认为此隧道为国际罕见具有世界级施工难度的隧道。兰渝铁路途经甘、陕、川、渝三省一市22个县(区、市),全长1171km,是国家《中长期铁路网规划》
After 7 years and 3 months, with the closure of the first arch bridge at the last one, the largest cross-section double-track railway tunnel in the country, Xinchengzi Tunnel of Lanzhou-Chongqing Railway runs smoothly. Xinchengzi tunnel due to geological reasons, the hardships of the construction process, the difficulties of construction operations, rare in the world. High stress, large deformation of soft rock, large sections of various adverse factors superimposed together, hole is very difficult. During the construction, experts at home and abroad have paid close attention to the tunnel construction and agreed that this tunnel is a rare international tunnel with world-class construction difficulty. Lanzhou-Chongqing railway passes through Gannan, Gansu, Sichuan and Chongqing provinces and cities 22 counties (autonomous regions and municipalities), a total length of 1171km, is the national “long-term railway network planning”