论文部分内容阅读
长期以来,我国把控制工程造价的主要精力放在施工阶段审核施工图预算、合理结算建安工程价款上。对设计方案或施工图的审查,多注重于技术性,而忽视其经济性。通过对比分析和论证,我们认识到要有效地控制建设工程造价,只有坚决地把控制重点由原来的单一的对项目实施阶段的控制转移到工程项目建设的各个阶段上来,对各个阶段均采取不同的行之有效的造价管理和控制方法,才能取得事半功倍的效果。
For a long time, our country has put the main effort to control the construction cost on the review of the construction drawing budget and the reasonable settlement of the construction project cost. The review of a design or construction drawing focuses more on technicality while ignoring its economy. Through comparative analysis and demonstration, we recognize that to effectively control the construction project cost, only by resolutely shifting the focus of control from the single control of the project implementation phase to each phase of the project construction and taking different measures in all stages Effective cost management and control methods in order to achieve a multiplier effect.