摘要:消防设施施工是建筑工程施工一个特殊的环节,其施工质量也决定着建筑工程交付使用之后的安全性和稳定性。因此,消防设施施工除了在设计和材料选择阶段进行质量控制之外,在安装施工阶段,也必须严抓质量控制,才能保障建筑工程消防设施的正常运行。本文针对目前消防设施施工过程中出现的问题,从整体施工管理、施工工艺控制、工程检测监督三方面提出消防施工质量监督与管理措施,用于指导目前的消防设施施工。
关键词:消防施工;隐患问题;质量监制
Abstract: the fire control facilities construction is the construction of a special link, its construction quality also determines the construction project delivery after the use of security and stability. Therefore, fire control facilities construction in addition to in the design and material selection stage quality control besides, in the installation phase, must also be strict quality control, to ensure construction fire normal operation of the facilities. This article in view of the present fire control facilities construction appeared in the process of problems, from the overall construction management, construction process control, engineering detection supervision and puts forward three fire control construction quality supervision and management measures, used to guide the current fire control facilities construction.
Keywords: fire construction; Concerns; Quality supervise the
中圖分类号:TU998.1文献标识码:A 文章编号:2095-2104(2012)
前言:在现代建筑工程施工中,人们对建筑物的结构、安全性能等方面越发关注,因此建筑工程消防设施施工的质量关注度也随之增加。在建筑工程消防验收中,也对消防给水管道的安全性、供水能力等方面也提出了更高的要求。建立行之有效的控制措施则是建筑工程施工过程控制的重点。
一、消防工程施工存在问题
(一)施工队伍人员素质参差不齐、高低不同。在消防设施工程施工方面缺少相应的人才,技术素质好、熟悉试验方法和试验设备并经过考核合格的施工人员尤为缺乏,所以对此类工程的施工只停留于表面,而未作技术推敲和运用科学、统一的检测和试验方法。
(二)施工操作违反施工方案和规范要求
消防工程施工过程中往往存在施工人员不按操作规范施工的问题,给工程质量埋下隐患。
1.管网试压分试漏检验和强度试验两步进行。目前有些工地只对管网进行试漏试验,且试验压力不符合设计和规范要求,这将有可能导致将来火灾救护时因管网水压不足而失效。管网安装应采用螺纹、沟槽式管接头或法兰连接,许多工程为图方便和少花钱,对镀锌钢管采用大量焊接,埋下了隐患。
2.室内消火栓配件和安装未能满足消防要求室内消防栓及配件采购时由于验收手续不全或者长期存放的原因,使箱体内的水带、接扣、水枪均有损坏,部分接口处未安装卡簧,导致试水时接口和水带脱落。消防竖管管径过小,未按消防标准设置,导致水流量无法满足规范要求。 3.火灾自动报警系统布线与通信线缆混装,报警系统联动功能失效,不符合要求。《火灾自动报警系统施工及验收规范规范》明确指出:不同系统、不同电流类别的线路,不应穿在同一管内或线槽的同一槽内。本项目施工中将火灾报警系统布线与网络通信线路同管布装,存在安全隐患。试水末端放水验收过程中,未见系统压力指示有任何变化,水流指示器不动作,水力警铃无反应,防火卷帘下降、电梯迫降等联动功能失效。
二、消防工程施工质量控制措施
(一)材料符合规范采购人员应当具有较高素质,选择的消防工程材料必须符合消防规范。比如消防栓箱门材质要求为玻璃,但是仍有部分施工队伍采用候补木门的方式。消防产品验收时,要注意水管接扣、水枪等产品应有形式认可标志,水枪、水带等应采用统一规格产品。 (二)加大施工队伍人员消防施工技能培训
消防施工人员的素质直接决定消防施工工作的质量,消防施工要求技术人员应有较高的施工技能和施工经验,因此应当有针对性地开展对消防施工人员的职业化、专业化培训。
(三)施工前要对施工班组做好技术交底工作
消防施工对技术要求较高,在施工前要使参与施工活动的每一位技术人员,明确本工程的特定的施工条件、施工组织、具体技术要求和有针对性的关键技术措施,系统掌握工程施工企业的全貌和施工的关键部位,使施工质量达到设计和国家施工验收规范。
施工操作满足规范
施工过程中的每一道工序都必须满足规范要求。以管网试压为例,管网试压的试漏检修和强度试验必须符合规范要求。试漏是在常压或稍起压状态下进行,而强度试验分工作压力和试验压力两阶段进行。管网施工必须要按照规范的要求,建议管网安装完毕后,要由监理旁站进行强度试验和严密性试验。
(五)重视自检工作
现行的消防验收方式是由公安消防机构对消防系统进行一定数量的抽查和检查,根据抽查和检查的结果判定工程是否合格。由此导致的问题施工方片面重视对实物抽查结果而忽视对施工档案及验收申报资料的审查。因此在消防验收之前,应该加强消防工程施工过程监管力度及自我检查,将施工证明材料与现场工况一一对应,对于无法提供技术证明的施工工序在补齐文件前不予报批。进行自检时,应采取科学的验收方式,提高技术含量,既要认真开展抽查检验,又要加强对施工档案的审查,做到理据充分,操作严密,尤其是要加强对施工档案的存档及备案制度。
三、从施工工艺控制施工质量
(一)气压给水装置
在安装前,要检查气压水罐的容积、气压、水位;工人压力是否符合设计要求,所配水泵是否与其相匹配。罐上应安装安全阀、压力表、泄水管、水位指示器等。罐的进、出水管、充气管上应有单向阀和闸阀,充气管上还应有安全阀和气压表,罐体的安装位置、标高、进出水方向均应严格按图施工。
安装完后的气压水罐周围应有不小于0.7M宽的净空。地面和罐体上任何部件间的距离均不得小于0.5M,这样有利于操作和维护,罐顶至建筑结构最低点的间距应小于1M。
(二)消防水泵
消防水泵安装前应首先对其进行规范检测,符合要求后进行泵的找平。找平时应注意,电动机与泵连接前,应单独试验电动机转向,确认无误后再连接,主动轴与从动轴以联轴节连接时,两轴的不同轴度、两半联端面间隙符合设备技术文件的规定。找平、灌浆后进行管道附件安装。
(三)室外消火栓安装
经长途运输或存放太久的室外消火栓,安装前应进行强度试验及严密性试验。室外消火栓应连接在带底座三通或弯头上,下面在设置砼预制。做好地上地下消防栓安装工作,消火栓的地上部分应涂CD4—42大红醇酸磁漆,地下部分应涂L01—6黑色沥青。
(四)室内消火栓的安装
同一建筑物内的室内消火栓,应采用同一厂家同种规格、型号的产品,以便于维修、保养和使用。室内消火栓的安装方式可分为明装、半明装和暗装等种。安装时必须取下箱内的水枪、消防水带等部件,不得用钢扦撬、锤子敲的方法将箱硬塞入预留孔内,而应将其平稳的放入,定好位后,四周缝隙用填料填补饱满。消火栓口应朝外,栓口中心距地面为1.2M,允许偏差20MM;栓口中心距箱侧面为140MM,距箱后表面为100MM,允许偏差均是5MM,消防水带与快速接头绑扎好后,应根据箱内构造按照国标图集的几种固定形式之一将消防水带挂上或盘绕在带盘上。
(五)报警阀安装
湿式报警阀组是湿式自动喷水灭火系统最主要的设备之一,其施工流程如下:
水源蝶阀安装——湿式报警阀安装——报警水道及延时器、水力警铃、压力开关等安装——排水阀、排水管安装——压力表安装
安装工程中要注意:湿式报警阀应垂直安装,离地高度应为1.2m,两侧离墙距离不少于0.5m,正面距墙不少于1.2m。同时,地面采取相应排水措施。延时器至水力警铃采用DN20或DN15的镀锌钢管。当采用DN15钢管时,其长度不应超过6m;当采用DN220钢管时,其长度不应超过20m。水力警铃应安装在公共通道或有人的值班室内。
四、消防工程施工的质量检验监督
在施工现场要对产品的安装规定、耐压性、压力要求等进行检测,将检测放在消防设施的施工过程中,无论对消防设备和重要配件,还是施工过程中各工序的检测都要做到全方位随时检查,随时记录,并备有完整的档案。涉及安全和功能有关的产品,应按专业工程质量验收规范进行复验,并应经监理工程师检查认可。
(一)各工序应按施工技术标准进行每一道检查测试,排除隐患,并作记录,在检查合格后,才能进行下一道工序施工。涉及到安全和可能造成日后隐患的施工工序,必须用仪器进行数据检测,例如绝缘电阻、接地电阻、接触电阻等。
(二)消防水泵有三种启动方式,即水泵控制柜现场启动、自动启动和消防控制室远程启动时,应对这三种启动方式进行测试,并核对反馈信号。
(三)对消防警铃和广播的功能检查时,不能以听到声响为准,应以确保每个警铃和扬声器都能正常工作。
(四)在進行系统联动测试时,要注意报警控制器所显示的位置与探测器的位置保持一致。对防、排烟系统,在阀门动作后,核对消防控制室的反回信号,同时应能联动消防风机启动。在一台风机供几个阀使用时,应对每个阀体动作后联动风机的情况进行测试,以验证程序的正确性。
五、结语
当前公安消防监督机构加大对建筑消防工程的消防安全检查力度。施工单位加强消防工程的质量监督与管理不仅是响应政府机关的工作,更是对人民生命负责、对本公司质量形象负责。要做好消防工程,施工单位就应当不断增强消防意识,提高施工人员素质,不断改进消防新型管道材料、生产工艺和消防设施设备,不断总结设计和施工安装过程中的经验教训,制定出科学、合理、有效地消防管理制度和措施,保证建筑工程消防管理方法的不断创新,提升消防工程质量。
参考文献:
[1]温义海.浅谈建筑工程消防设施施工存在的问题及举措[J].山西建筑,2008(08).
[2]容康松.建筑消防设施设计施工中应注意的几个问题[J].四川建材,2010(01).
关键词:消防施工;隐患问题;质量监制
Abstract: the fire control facilities construction is the construction of a special link, its construction quality also determines the construction project delivery after the use of security and stability. Therefore, fire control facilities construction in addition to in the design and material selection stage quality control besides, in the installation phase, must also be strict quality control, to ensure construction fire normal operation of the facilities. This article in view of the present fire control facilities construction appeared in the process of problems, from the overall construction management, construction process control, engineering detection supervision and puts forward three fire control construction quality supervision and management measures, used to guide the current fire control facilities construction.
Keywords: fire construction; Concerns; Quality supervise the
中圖分类号:TU998.1文献标识码:A 文章编号:2095-2104(2012)
前言:在现代建筑工程施工中,人们对建筑物的结构、安全性能等方面越发关注,因此建筑工程消防设施施工的质量关注度也随之增加。在建筑工程消防验收中,也对消防给水管道的安全性、供水能力等方面也提出了更高的要求。建立行之有效的控制措施则是建筑工程施工过程控制的重点。
一、消防工程施工存在问题
(一)施工队伍人员素质参差不齐、高低不同。在消防设施工程施工方面缺少相应的人才,技术素质好、熟悉试验方法和试验设备并经过考核合格的施工人员尤为缺乏,所以对此类工程的施工只停留于表面,而未作技术推敲和运用科学、统一的检测和试验方法。
(二)施工操作违反施工方案和规范要求
消防工程施工过程中往往存在施工人员不按操作规范施工的问题,给工程质量埋下隐患。
1.管网试压分试漏检验和强度试验两步进行。目前有些工地只对管网进行试漏试验,且试验压力不符合设计和规范要求,这将有可能导致将来火灾救护时因管网水压不足而失效。管网安装应采用螺纹、沟槽式管接头或法兰连接,许多工程为图方便和少花钱,对镀锌钢管采用大量焊接,埋下了隐患。
2.室内消火栓配件和安装未能满足消防要求室内消防栓及配件采购时由于验收手续不全或者长期存放的原因,使箱体内的水带、接扣、水枪均有损坏,部分接口处未安装卡簧,导致试水时接口和水带脱落。消防竖管管径过小,未按消防标准设置,导致水流量无法满足规范要求。 3.火灾自动报警系统布线与通信线缆混装,报警系统联动功能失效,不符合要求。《火灾自动报警系统施工及验收规范规范》明确指出:不同系统、不同电流类别的线路,不应穿在同一管内或线槽的同一槽内。本项目施工中将火灾报警系统布线与网络通信线路同管布装,存在安全隐患。试水末端放水验收过程中,未见系统压力指示有任何变化,水流指示器不动作,水力警铃无反应,防火卷帘下降、电梯迫降等联动功能失效。
二、消防工程施工质量控制措施
(一)材料符合规范采购人员应当具有较高素质,选择的消防工程材料必须符合消防规范。比如消防栓箱门材质要求为玻璃,但是仍有部分施工队伍采用候补木门的方式。消防产品验收时,要注意水管接扣、水枪等产品应有形式认可标志,水枪、水带等应采用统一规格产品。 (二)加大施工队伍人员消防施工技能培训
消防施工人员的素质直接决定消防施工工作的质量,消防施工要求技术人员应有较高的施工技能和施工经验,因此应当有针对性地开展对消防施工人员的职业化、专业化培训。
(三)施工前要对施工班组做好技术交底工作
消防施工对技术要求较高,在施工前要使参与施工活动的每一位技术人员,明确本工程的特定的施工条件、施工组织、具体技术要求和有针对性的关键技术措施,系统掌握工程施工企业的全貌和施工的关键部位,使施工质量达到设计和国家施工验收规范。
施工操作满足规范
施工过程中的每一道工序都必须满足规范要求。以管网试压为例,管网试压的试漏检修和强度试验必须符合规范要求。试漏是在常压或稍起压状态下进行,而强度试验分工作压力和试验压力两阶段进行。管网施工必须要按照规范的要求,建议管网安装完毕后,要由监理旁站进行强度试验和严密性试验。
(五)重视自检工作
现行的消防验收方式是由公安消防机构对消防系统进行一定数量的抽查和检查,根据抽查和检查的结果判定工程是否合格。由此导致的问题施工方片面重视对实物抽查结果而忽视对施工档案及验收申报资料的审查。因此在消防验收之前,应该加强消防工程施工过程监管力度及自我检查,将施工证明材料与现场工况一一对应,对于无法提供技术证明的施工工序在补齐文件前不予报批。进行自检时,应采取科学的验收方式,提高技术含量,既要认真开展抽查检验,又要加强对施工档案的审查,做到理据充分,操作严密,尤其是要加强对施工档案的存档及备案制度。
三、从施工工艺控制施工质量
(一)气压给水装置
在安装前,要检查气压水罐的容积、气压、水位;工人压力是否符合设计要求,所配水泵是否与其相匹配。罐上应安装安全阀、压力表、泄水管、水位指示器等。罐的进、出水管、充气管上应有单向阀和闸阀,充气管上还应有安全阀和气压表,罐体的安装位置、标高、进出水方向均应严格按图施工。
安装完后的气压水罐周围应有不小于0.7M宽的净空。地面和罐体上任何部件间的距离均不得小于0.5M,这样有利于操作和维护,罐顶至建筑结构最低点的间距应小于1M。
(二)消防水泵
消防水泵安装前应首先对其进行规范检测,符合要求后进行泵的找平。找平时应注意,电动机与泵连接前,应单独试验电动机转向,确认无误后再连接,主动轴与从动轴以联轴节连接时,两轴的不同轴度、两半联端面间隙符合设备技术文件的规定。找平、灌浆后进行管道附件安装。
(三)室外消火栓安装
经长途运输或存放太久的室外消火栓,安装前应进行强度试验及严密性试验。室外消火栓应连接在带底座三通或弯头上,下面在设置砼预制。做好地上地下消防栓安装工作,消火栓的地上部分应涂CD4—42大红醇酸磁漆,地下部分应涂L01—6黑色沥青。
(四)室内消火栓的安装
同一建筑物内的室内消火栓,应采用同一厂家同种规格、型号的产品,以便于维修、保养和使用。室内消火栓的安装方式可分为明装、半明装和暗装等种。安装时必须取下箱内的水枪、消防水带等部件,不得用钢扦撬、锤子敲的方法将箱硬塞入预留孔内,而应将其平稳的放入,定好位后,四周缝隙用填料填补饱满。消火栓口应朝外,栓口中心距地面为1.2M,允许偏差20MM;栓口中心距箱侧面为140MM,距箱后表面为100MM,允许偏差均是5MM,消防水带与快速接头绑扎好后,应根据箱内构造按照国标图集的几种固定形式之一将消防水带挂上或盘绕在带盘上。
(五)报警阀安装
湿式报警阀组是湿式自动喷水灭火系统最主要的设备之一,其施工流程如下:
水源蝶阀安装——湿式报警阀安装——报警水道及延时器、水力警铃、压力开关等安装——排水阀、排水管安装——压力表安装
安装工程中要注意:湿式报警阀应垂直安装,离地高度应为1.2m,两侧离墙距离不少于0.5m,正面距墙不少于1.2m。同时,地面采取相应排水措施。延时器至水力警铃采用DN20或DN15的镀锌钢管。当采用DN15钢管时,其长度不应超过6m;当采用DN220钢管时,其长度不应超过20m。水力警铃应安装在公共通道或有人的值班室内。
四、消防工程施工的质量检验监督
在施工现场要对产品的安装规定、耐压性、压力要求等进行检测,将检测放在消防设施的施工过程中,无论对消防设备和重要配件,还是施工过程中各工序的检测都要做到全方位随时检查,随时记录,并备有完整的档案。涉及安全和功能有关的产品,应按专业工程质量验收规范进行复验,并应经监理工程师检查认可。
(一)各工序应按施工技术标准进行每一道检查测试,排除隐患,并作记录,在检查合格后,才能进行下一道工序施工。涉及到安全和可能造成日后隐患的施工工序,必须用仪器进行数据检测,例如绝缘电阻、接地电阻、接触电阻等。
(二)消防水泵有三种启动方式,即水泵控制柜现场启动、自动启动和消防控制室远程启动时,应对这三种启动方式进行测试,并核对反馈信号。
(三)对消防警铃和广播的功能检查时,不能以听到声响为准,应以确保每个警铃和扬声器都能正常工作。
(四)在進行系统联动测试时,要注意报警控制器所显示的位置与探测器的位置保持一致。对防、排烟系统,在阀门动作后,核对消防控制室的反回信号,同时应能联动消防风机启动。在一台风机供几个阀使用时,应对每个阀体动作后联动风机的情况进行测试,以验证程序的正确性。
五、结语
当前公安消防监督机构加大对建筑消防工程的消防安全检查力度。施工单位加强消防工程的质量监督与管理不仅是响应政府机关的工作,更是对人民生命负责、对本公司质量形象负责。要做好消防工程,施工单位就应当不断增强消防意识,提高施工人员素质,不断改进消防新型管道材料、生产工艺和消防设施设备,不断总结设计和施工安装过程中的经验教训,制定出科学、合理、有效地消防管理制度和措施,保证建筑工程消防管理方法的不断创新,提升消防工程质量。
参考文献:
[1]温义海.浅谈建筑工程消防设施施工存在的问题及举措[J].山西建筑,2008(08).
[2]容康松.建筑消防设施设计施工中应注意的几个问题[J].四川建材,2010(01).