论文部分内容阅读
本文探讨了用有限元进行三向沙流计算的方法和计算技巧,以及用这种方法对韩城发电厂灰场坝区三向渗流的计算成果,并由此成果讨论了贮灰场渗流场的特点及工程上应注意的问题。
This paper discusses the method and calculation technique of three-direction sand flow calculation by finite element method and the calculation results of three-way seepage flow in the ash field dam of Hancheng Power Plant by this method. From the result, the seepage field of the ash field is discussed Features and engineering should pay attention to the problem.