钢筋位移是剪力墙施工的常见质量通病。它主要表现在钢筋保护层过厚或过薄,甚至出现露筋现象;墙板双排钢筋间距过大或过小,甚至变成一排钢筋:也由于钢筋在每层楼面处间距不准确、偏位,造成上层钢筋施工困难等。针对以上缺陷,我们在施工中采取了一些行之有效的措施,取得了良好的效果。现将具体作法介绍如下。1.按常规作法,钢筋保护层一般可采用水泥砂浆垫块。垫块的厚度要符合图纸要求,垫块应绑扎在双向钢筋网的外皮钢筋上。
Rebar displacement is a common quality common problem in shear wall construction. It is mainly manifested in the protective layer is too thick or too thin protective layer, or even dew phenomenon; double row of steel wall spacing is too large or too small, or even into a row of steel: Also due to the reinforcement at each floor spacing is not accurate , Deviation, resulting in the construction of the upper bar and other difficulties. In view of the above defects, we have taken some effective measures in the construction and achieved good results. Specific practices are introduced below. 1. According to normal practice, reinforced concrete mortar pads can generally block. Pad thickness to meet the requirements of the drawings, the pad should be tied in the two-way steel mesh skin reinforcement.