论文部分内容阅读
介绍广州市轨道交通三号线客村站转换层结构转换施工中控制已有结构变形的技术措施,说明在结构转换中变形控制是整个结构托换中的关键问题。
This paper introduces the technical measures to control the existing structural deformation during the conversion of the transfer floor structure of the Kecun Station of Guangzhou Metro Line No. 3. It shows that the deformation control is the key issue for the whole structure underpinning in the structural transformation.