随着时代的发展,原有的工时统计系统已经不能满足企业发展的要求,因此需要研究和开发新的工时管理系统。新系统根据水利水电工程设计行业特点,以项目WBS策划管理为基础,结合网络平台及现代IT技术,采用浏览器/服务器(简称B/S)结构和关系型数据库管理。新系统可以为积累项目实耗工时提供历史数据,为形成工时定额标准奠定基础,同时为项目投标报价阶段工时及费用报价提供可靠依据。
With the development of the times, the original timekeeping statistics system can no longer meet the requirements of the enterprise development. Therefore, it is necessary to research and develop a new time management system. The new system is based on the planning and management of the project WBS, based on the characteristics of the water conservancy and hydropower engineering design industry, and combines the web platform and modern IT technology with the browser / server (B / S) structure and relational database management. The new system can provide historical data for accumulating real working hours of the project, and lay the foundation for forming the working hour quota standard, and at the same time provide a reliable basis for the quotation of working hours and cost for the bidding stage of the project.