晓南矿现主井提升机使用的润滑站冷却方式为水冷,水冷方式既耗水又耗电,如将其改为风机冷却,增大散热面积,同时增设温度控制系统,使风机根据油温变化自动启动或停止,在满足生产的需求下,合理控制开机时间。经分析,改造后可杜绝由于巡检滞后、开启冷却装置不及时而导致的问题,既保证安全生产,又节水节电,具有较强的可操作性。
Xiaonan mine is the main shaft hoist lubrication station cooling method is water-cooled, water-cooled way both water and power consumption, such as the fan to be cooled to increase the cooling area, while additional temperature control system, the fan according to the oil temperature Changes automatically start or stop, to meet the production needs, reasonable control of the boot time. After the analysis, the transformation can eliminate the problems caused by the lag inspection and the untimely opening of the cooling device, which not only ensures safety in production but also saves water and electricity and has strong operability.