本文介绍汉江五桥引桥200m连续现浇箱梁预应力管道定位、钢绞线穿束,预应力张拉等监理控制要点及注意事项。
This article introduces the key points and precautions of supervision and control of 200m continuous on-site pouring box girder of Hanjiang River Fifth Bridge, such as prestressed pipe positioning, strand passing, prestressing and tensioning.